Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />I <br /> <br />laboratory of the water supplied to COMPANY. In the event <br />COMPANY desires a more comprehensive chemical analysis of the <br />water supplied, then the cost of such shall be borne by COMPANY. <br />5..3 The CITY bears no degree of responsibility for the <br />water quality at any point beyond the meter described in Article <br />1. COMPANY bears the responsibility for maintaining the water <br />quality at any point beyond the meter and within COMPANY'S <br />distribution system. <br />5.4 COMPANY shall notify and keep the CITY informed of <br />persons responsible for the integrity of COMPANY'S distribution <br />system. <br />5.5 Each of the parties shall immediately notify the other <br />party's City Manager or Plant Manager, or such Manager's <br />designee, as the case may be, of any emergency or condition which <br />may affect the quality or quantity of water in either party's <br />system. <br /> <br />5.6 The CITY reserves the r igh t to make <br />those facilities which may affect the quality <br />supplied to COMPANY and perform required tests. <br />VI. <br />Equipment and operation <br />6.1 COMPANY shall provide and maintain all lines and valves <br />on COMPANY'S s ide of the wa ter meter descr i bed in Ar ticle I, <br />which meter marks the limit of the CITY'S responsibility for <br />maintenance. COMPANY shall maintain at all times, in working <br /> <br />inspec tions of <br />of the water <br /> <br />-3- <br />