My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08 - Garver Engineering Agreement Contract Amendment #1 for Wastewater Plan Project
City-of-Paris
>
City Council
>
Agenda Packets
>
2021
>
02 - FEBRUARY
>
February 8
>
08 - Garver Engineering Agreement Contract Amendment #1 for Wastewater Plan Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2021 2:48:23 PM
Creation date
2/4/2021 2:39:26 PM
Metadata
Fields
Template:
AGENDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Construction Packa a 2: <br />• Rehabilitation of the influent line from the WWTP to the flow equalization basin <br />(approximately 3.3 miles). This will include pipeline plan and section drawings for this route <br />within the existing easements. <br />New primary clarifier flow splitter structure. <br />• New primary clarifiers. <br />• New secondary clarifier. <br />• New solids holding tanks to work in conjunction with existing structures to provide 10 days of <br />solids storage. <br />• Paving throughout the plant site and as designated by Conceptual Design Report's Drawing <br />No. 03. <br />• New administration building. <br />1. Funding Assistance <br />Garver will assist the Owner during the design phase with the pursuit of funding through one funding <br />source, the Texas Water Development Board (TWDB). Gamer cannot guarantee that funding for this <br />project will be available or that the Owner will be successful in qualifying for such. <br />Garver will perform the following tasks: <br />• Coordinate with the Texas Water Development Board via telephone as needed for project <br />updates. <br />• Provide design deliverables to the TWDB at each phase. <br />• Provide engineering documents needed for loan closure such as useful life certificate. <br />• Coordinate bid documents with TWDB to provide program compliance. <br />2. Surveys <br />2.1. Boundary Survey <br />Garver will perform a boundary survey with metes and bounds description for the land on which the <br />City of Paris wastewater treatment plant is located, along with easement boundaries for the WWTP <br />access road from US Hwy 271 into the WWTP. <br />2.2. Pipeline Easement Survey and Documents <br />Garver will perform a topographic survey at 50 ft contours along the existing influent force main easement <br />and the gravity portion from the existing WWTP site to the peak flow basin. This survey will assume a 100 <br />ft survey width. The survey will include a centerline on the existing pipeline easement and denote cross <br />sections of creeks, significant grade breaks, as well as any features such as culverts, fences, and tree <br />lines. <br />Records research for the alignment to located recorded easement documents will be conducted. The <br />descriptions will be located, plotted, and easements tied to the survey document. <br />If any additional geotech is needed, Garver will notify the Owner to acquire the additional geotechnical <br />boring and reports. <br />3. Environmental Services <br />Garver will prepare and submit a request for a Categorical Exclusion (CE) to the TWDB. This includes a <br />detailed request to the TWDB, justification for the CE, and a copy of the Preliminary Engineering Report. <br />Appendix A - Scope of Services 2 of 9 <br />City of Paris WWTP Improvements <br />
The URL can be used to link to this page
Your browser does not support the video tag.