My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09 - Agreement with WRA Architects for pre-design services for Love Civic Center Restoration Project
City-of-Paris
>
City Council
>
Agenda Packets
>
2021
>
02 - FEBRUARY
>
February 8
>
09 - Agreement with WRA Architects for pre-design services for Love Civic Center Restoration Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2021 2:48:53 PM
Creation date
2/4/2021 2:40:09 PM
Metadata
Fields
Template:
AGENDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment "All <br />SCOPE OF SERVICES <br />PHASEI <br />CONSULTATION AND PRIORITIZATION SERVICES <br />kio' Grayson Path January 28, 2021 <br />Oty Nlanage�r PwolposM f*r Architectural/ Enginpeflng Services <br />13 5 !SE I I 5h ept <br />PwK RX 7546,13 <br />Re, 11rolposal fur City Of airis, lirX Cja�lhir' CeIRter <br />Dear kir. Path: <br />)VII:'A A?chfteds i <br />,,, hic, and Caffey AschRectwe �s pleased to piresent the kidlowhig piropoW <br />ArchRecturaN i Engineeii nig Sei3Oces to the Gily w Park, tear the kwkwhng prqect, <br />I avie Civic Center Restoration <br />tasty. Fee- rhe Ardflibectuiall / Enghmeihig 5einAce ite for this jjwrjecit iMHhe a pen:enwp:^, 011 <br />coristruction cost based on dre budget and scolse oudired hn the prnposaw bdmv, <br />F111hase'l - Progianunhigand p!iasied nraster 15iaxn — Lurnipsum not to exceeci <br />$13, 00!1, <br />111re Tai w,'Ong project ridated services are nol� uncler the Air-hitecks' sicope d responsflbHfty and mica <br />contrasled dh-ecdy n,fth the city,shia,fld they be requirerh 113owidwy and topoppaphic siun-vey, Site <br />jjpiattern g, onvfirsmnentai testing iniclludlhg asbestos survert, geo-technkzd hivestigaawn and <br />flowisdafloin recon-uniendatimors, cor[sfiruicNowi oai�erW testiling, and dWAC test and Wance <br />/Comrnlaskpn�ql <br />Project Scolm: The proiect consislis cd Design aird 11 )ocumenta6m, of a mnovaflon to the � ove <br />Chk Center Nocated at 2025 5,, CoHegWe Dr,� <br />, ,Iaii !is, TX 75460 hi 2017, qATA compkteid a <br />facMty study kfiat found the buddhig hs to need of mofting uppadaa, HV'AC upgiadies, as vveH as <br />acoustic upgrades It rs ow miderstandhig, that WIRA wl'H meeA v0th necessary connmiMee <br />rinembeys to hellp devekyi a mastsq.Oan ior sco;iie, rClse6fle, as m,dll as Ilao.notpt� <br />AMA 12,377 Mmif DFf"e, SqAtq IRTIM Dalllw 7mzag Y525';.N-750-0077 <br />Architectural Services Contract <br />WRA Architects, Inc. Page 13 of 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.