Laserfiche WebLink
Item No. 9 <br />Code Enforcement Report: Janygry, 2021 <br />Cases Worked: 281 <br />Cases Completed: 117 <br />Initial Inspections: 258 <br />Re -inspections: 101 <br />Total Inspections: 359 <br />Lots Abated: 10 <br />Other Work by Abatement Crew: <br />Tree & Brush Removal — 6 days <br />Removed Tires — 3 days <br />Removed Illegal Dumps — 7 days <br />Repaired/Serviced Equipment — 4 days <br />Building and Standards Rg ort: Januar 2021 <br />There were 8 structures presented to the Building and Standards Commission: <br />520 Deshong <br />1219 E Hearon <br />1144 SW 5th <br />531 Brown <br />601 SE 6th <br />102 SW 7th <br />3310 E Houston <br />1535 W Walker <br />2 structures was removed in December: <br />1011 Church <br />921 E Houston <br />