Laserfiche WebLink
2021-2022 Materials Bid Tabulation <br />Item <br />Kyle Coston <br />Richard Drake Const <br />Krogman Sand & <br />Coston & Sons <br />Tex Horton <br />Gravel <br />155 E Oak Ave <br />6290 Hwy 271 N <br />Luke Krogman <br />Paris TX 75460 <br />PoWderly TX 75473 <br />PO Box 1336 <br />903.784.2321 <br />903.732.4781 <br />Paris TX 75461 <br />903.784.8627 <br />Aggregate Cover Stone Type B, Grade <br />NO BID <br />$41.25 <br />NO BID <br />4 Uncoated <br />Aggregate Cover Stone Type B, Grade <br />NO BID <br />NO BID <br />NO BID <br />5 Uncoated <br />Aggregate, Cover Stone Type B, <br />NO BID <br />NO BID <br />NO BID <br />Modified Grade 5 Uncoated <br />CRS -2 Emulsion Asphalt <br />NO BID <br />NO BID <br />NO BID <br />HMAC (Hot Mix Asphalt Concrete) Type <br />NO BID <br />$72.80 <br />NO BID <br />D <br />Hot Mix Cold Laid Asphalt Type "A" <br />NO BID <br />$66.80 <br />NO BID <br />Hot Mix Cold Laid Asphalt Type "B" <br />NO BID <br />$65.40 <br />NO BID <br />Hot Mix Cold Laid Asphalt Type "D" <br />NO BID <br />$67.20 <br />NO BID <br />Portland Cement Concrete 5 Sack <br />$122.00 <br />NO BID <br />NO BID <br />Portland Cement Concrete 6 Sack <br />$127.00 <br />NO BID <br />NO BID <br />Portland Cement Concrete <br />$118.00 <br />NO BID <br />NO BID <br />Grout 5 Sack <br />Portland Cement Concrete <br />$123.00 <br />NO BID <br />NO BID <br />Grout 6 Sack <br />Flexible Base (Red Rock) <br />NO BID <br />$17.15 <br />$15.75 <br />SS -1 Emulsion Asphalt (Tack Oil) <br />NO BID <br />NO BID <br />NO BID <br />Substitute CSS -1 or CSS -1 H for SS -1 <br />Sand <br />NO BID <br />$10.80 <br />$11.00 <br />Top Soil <br />NO BID <br />$10.60 <br />$11.50 <br />Flexible Base (White Rock) <br />NO BID <br />$16.50 <br />$16.95 <br />Ergon - Federal Environmental Fee will be added <br />to above prices at <br />a rate of $.49770/ton for <br />asphalt and <br />polymer loads or $.00150/gal for emulsion loads. <br />Bid is for full transport <br />loads of 5,500 gallons. <br />Freight is based <br />on a full transport load, even if a full load of <br />material is not ordered. <br />The common carrier bills <br />demurrage at $90 <br />gr hr. after the second hr. Return frei ht is <br />1 2 of the out oin tariff. <br />Pum and hose char <br />a is 90 er load. <br />