My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-007 - Evidencing the City's Intent to Establish a PACE Program
City-of-Paris
>
City Clerk
>
Resolutions
>
2021
>
2021-007 - Evidencing the City's Intent to Establish a PACE Program
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2021 3:30:53 PM
Creation date
2/23/2021 3:29:16 PM
Metadata
Fields
Template:
CITY CLERK
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(3) The assignee or transferee of the right to receive the payments <br />executes an explicit written assumption of all of lender's obligations under the <br />lender contract. <br />(n) Verification Review. After a Qualified Improvement is completed, the <br />Authorized Representative will require the property owner to provide verification by a <br />qualified independent third -party reviewer that the Qualified Improvement was properly <br />completed and is operating as intended.$ The verification report conclusively establishes <br />that the improvement is a Qualified Improvement and the project is qualified under the <br />PACE Program. <br />(o) Marketing and Education Services. City may subsequently enter into <br />agreements with one or more other local governments or non-profit organizations that <br />promote energy and water conservation and/or economic development to provide <br />marketing and education services for the PACE Program. <br />(p) Quality Assurance and Antifraud Measures. The Authorized <br />Representative will institute quality assurance and antifraud measures for the Program. <br />The Authorized Representative will review each PACE application for completeness and <br />supporting documents through independent review and verification procedures. The <br />application and required attachments will identify and supply the information necessary to <br />ensure that the property owner, the property itself, and the proposed project all satisfy <br />PACE Program underwriting and technical standard requirements. Measures will be put <br />in place to provide safeguards, including a review of the energy and water savings baseline <br />and certification of compliance with the technical standards manual from an independent <br />third -party reviewer (ITPR), who must be a registered professional engineer, before the <br />project can proceed. This review will include a site visit, report, and a letter from the ITPR <br />certifying that he or she has no financial interest in the project and is an independent <br />reviewer. After the construction of the project is complete, an ITPR will conduct a final <br />site inspection and determine whether the project was completed and is operating properly. <br />The reviewer's certification will also include a statement that the reviewer is qualified and <br />has no financial interest in the project. <br />(q) Delinquency. Under the terms of the form lender contract attached as <br />Exhibit 3, if a property owner fails to pay an agreed installment when due on the PACE <br />assessment, the lender will agree to take at least the following steps to collect the delinquent <br />installment: <br />(1) Mail to the owner a written notice of delinquency and demand for <br />payment by both certified mail (return receipt requested) and first-class mail, and <br />TX. Local Gov't Code §399.011. <br />- 11 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.