My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1988-120-RES WHEREAS, the City of Paris, has need services and Hayter Engineering, Inc., Paris, proposal for
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
1930-1999
>
1980-1989
>
1988
>
1988-120-RES WHEREAS, the City of Paris, has need services and Hayter Engineering, Inc., Paris, proposal for
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2006 4:34:19 PM
Creation date
4/17/2005 11:58:46 PM
Metadata
Fields
Template:
CITY CLERK
Doc Name
1988
Doc Type
Resolution
CITY CLERK - Date
12/19/1988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />1.25. Prepare a Report containing schematic layouts, sketches and <br />conceptual design criteria with appropriate exhibits to indicate clearly the <br />=nsiderations involved (including applicable requirements of governmental <br />authorities having jurisdiction as aforesaid) and setting forth ENGINEER'S <br />findings and recommendations. This Report will be accompanied by <br />ENGINEER'S opinion of probable =sts for the Project. ' <br /> <br />1.26. Furnish five =pies of the Study and Report documents and review <br />them in person with OWNER. <br /> <br />The duties and responsibilities of ENGINEER during the Study and Report <br />Phase are amended and supplemented as indicated in Exhibit A "Further <br />Description of Basic Engineering Services and Related Matters". <br /> <br />1.3. Preliminary DesiRn & Field Surveys Phase <br /> <br />After written authorization to proceed with this phase, ENGINEER shall: <br /> <br />1.3.L Perform on-the-ground <br />for certain portions of the <br />hereto. <br /> <br />surveys to develop more detailed drawings <br />project, as further described in Exhibit A <br /> <br />1.3.2 Advise OWNER if <br />described in paragraph <br />such data and services. <br /> <br />additional data or services of the types <br />3.4. are necessary and assist OWNER in obtaining <br /> <br />1.4. Final Design Phase <br /> <br />After written authorization to proceed with the Final Design Phase, <br />ENGINEER shall: <br /> <br />1.4.L On the basis of the accepted preliminary documents and the <br />opinion of probable Total Project Costs prepare for incorporation in the <br />Contract Documents final drawings to show the general scope, extent and <br />character of the work to be furnished and performed by CONTRACTOR(S) <br />(hereinafter called "Drawings") and Technical Specifications. <br /> <br />1.4.2 Provide technical criteria, written descriptions and design data for <br />OWNER'S use in obtaining approvals of such governmental authorities as <br />have jurisdiction to approve the design of the Project, and assist OWNER <br />in consultations with appropriate authorities. <br /> <br />1.4.3. Advise OWNER of any adjustments to the latest opinion or <br />probable Total Project Costs caused by changes in general scope, extent <br />or character or design requirements of the Project or Construction Costs, <br />Furnish to OWNER a revised opinion of probable Total Project Costs <br />based on the Drawings and Specifications. <br /> <br />1.4.4. Prepare for review and approval by OWNER, its legal counsel and <br />other advisors =ntract agreement forms, general =nditions, and <br />supplementary conditions, and bid forms, invitations to bid and <br />instructions to bidders and assist in the preparation of other related <br />documents. <br /> <br />Page 2 of 19 Pages <br />
The URL can be used to link to this page
Your browser does not support the video tag.