My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09 - Code Enforcement Report
City-of-Paris
>
City Council
>
Agenda Packets
>
2021
>
03 - MARCH
>
March 22
>
09 - Code Enforcement Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2021 4:27:49 PM
Creation date
3/19/2021 4:27:44 PM
Metadata
Fields
Template:
AGENDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item No. 9 <br />Code Enforcement Re ort: Februar 2021 <br />Cases Worked: 123 <br />Cases Completed: 167 <br />Initial Inspections: 123 <br />Re -inspections: 180 <br />Total Inspections: 272 <br />Lots Abated: 10 <br />Other Work by Abatement Crew: <br />Tree & Brush Removal —1 days <br />Removed Tires — 5 days <br />Removed Illegal Dumps — 3 days <br />Repaired/Serviced Equipment -5 days <br />Removed Snow/Ice — 9 days <br />Building and Standards Report: February, 2021 <br />There were 6 structures presented to the Building and Standards Commission: <br />348 NE 6th <br />1033 NE 7th <br />529 Pine Bluff <br />441 NE 13th <br />233 NW 18th <br />1803 Graham <br />2 structures was removed in December: <br />705 E Cherry <br />715 E Cherry <br />
The URL can be used to link to this page
Your browser does not support the video tag.