Laserfiche WebLink
Item No. 9 <br />Code Enforcement Re ort: Februar 2021 <br />Cases Worked: 123 <br />Cases Completed: 167 <br />Initial Inspections: 123 <br />Re -inspections: 180 <br />Total Inspections: 272 <br />Lots Abated: 10 <br />Other Work by Abatement Crew: <br />Tree & Brush Removal —1 days <br />Removed Tires — 5 days <br />Removed Illegal Dumps — 3 days <br />Repaired/Serviced Equipment -5 days <br />Removed Snow/Ice — 9 days <br />Building and Standards Report: February, 2021 <br />There were 6 structures presented to the Building and Standards Commission: <br />348 NE 6th <br />1033 NE 7th <br />529 Pine Bluff <br />441 NE 13th <br />233 NW 18th <br />1803 Graham <br />2 structures was removed in December: <br />705 E Cherry <br />715 E Cherry <br />