Laserfiche WebLink
Item No. 9 <br />Code Enforcement Re ort: March 2021 <br />Cases Worked: 236 <br />Cases Completed: 115 <br />Initial Inspections: 231 <br />Re -inspections: 125 <br />Total Inspections: 356 <br />Lots Abated: 21 <br />Other Work by Abatement Crew: <br />Tree & Brush Removal — 3 days <br />Removed Tires — 5 days <br />Removed Illegal Dumps — 2 days <br />Repaired/Serviced Equipment —1 days <br />Worked on Archery Lanes — 9 days <br />BuildinK and Standards Report: March _2021 <br />There were 6 structures presented to the Building and Standards Commission: <br />221 W Kaufman <br />808 Pine Bluff <br />438 W Campbell <br />745 Graham <br />1353 W Shiloh <br />614 SE 12th <br />1 structure was removed in March: <br />745 Graham <br />