My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11 - Agreement with Richard Drake Construction for concrete demolition & construction services
City-of-Paris
>
City Council
>
Agenda Packets
>
2021
>
05 - MAY
>
May 10
>
11 - Agreement with Richard Drake Construction for concrete demolition & construction services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2021 1:36:58 PM
Creation date
5/6/2021 1:28:21 PM
Metadata
Fields
Template:
AGENDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Care will be used to insure that adjacent property outside the right-of-way line is protected. <br />6. Demolition: Contractor is responsible for the demolition, disposal and cleanup of existing curb/gutter, <br />driveway approaches, sidewalk, etc. <br />7. Construction: Contractor is responsible for the construction of new curb/gutter, driveway approaches, <br />sidewalk, etc. <br />8. ADA: All construction must comply with American Disabilities Act (ADA) and standard TXDOT <br />specifications, except as amended by the project specifications or drawings to be provided by the City. <br />9. Site: Contractor is responsible for keeping the project area clean during construction and is responsible for <br />final cleanup of project site. <br />10. Locations: The City of Paris Public Works Department will assign project areas as needed in various <br />locations. <br />11. Down Time: The City of Paris will direct the work in coordination with the contractor to expedite completion <br />of work and to minimize any down time and moving time. <br />12. Inspection: ction: The City of Paris Public Works Department will inspect the project site on a daily basis. <br />13. Point of Contact: The contractor selected for this assignment will work closely with City staff. The Street <br />Superintendent, or his designee, will serve as the primary point of contact and will be responsible for <br />coordinating and implementing the subsequent work. Other officials who will be involved in this project <br />include, but are not limited to, the Public Works Director and the City Engineer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.