Laserfiche WebLink
<br />CHANGE ORDER NO. 1 & FINAL <br />1987 CENTRAL INTERCEPTOR REHABILITATION <br />CITY OF PARIS, TEXAS <br />PROJECT NO. 87.11 <br /> <br />ADD THE FOLLOWING: <br /> <br />Description <br /> <br />Excavate trench, install 27" <br />polyethylene "Spirolite" <br /> <br />6'-12' trench depth <br /> <br />Over 12' trench depth <br /> <br />Trench Safety System <br /> <br />Install Concrete Tapping <br />Manhole <br /> <br />Install Concrete Drop <br />Manhole <br /> <br />Purchase Drop Manhole <br />Materials as Instructed <br /> <br />Easement Clean-up and <br />Restoration <br /> <br />Low Pressure Air Test <br /> <br />Sewage Diversion, Tapping <br />existing sewer, pumping <br />and all appurtenant work <br /> <br />Backfill Existing sewer <br />collapses <br /> <br />Sewer Line Abandonment <br /> <br />DEDUCT THE FOLLOWING: <br /> <br />27" Test Plugs <br /> <br />Quantity <br /> <br />Unit Price <br /> <br />Total <br /> <br />650 L,F. $ 13.80 $9,970.00 <br />436 L. F. 15.80 6,888.80 <br />1,086 L.F. 3.00 3,258.00 <br />19 V.L.F. 65.00 1,235.00 <br />19 V.L.F. 65.00 1,235.00 <br />L.S. 201. 20 201.20 <br />1,200 L.F. 1.50 1,800.00 <br />1,086 L.F. 0.34 369.24 <br /> <br />L.S. <br /> <br />975.00 <br /> <br />975.00 <br /> <br />3 ea. <br /> <br />150.00 <br /> <br />450.00 <br />300.00 <br />$25,682.24 <br /> <br />L.S. 300.00 <br />TOTAL INCREASE <br /> <br />L.S. <br /> <br /><$1,407.00> <$1,407.00> <br /> <br />TOTAL DEDUCT <br />NET INCREASE <br /> <br /><$1,407.00> <br />$24,275.24 <br />