My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11 - Final Plat - Lots 1&2 Block A CEFCO North Addition
City-of-Paris
>
City Council
>
Agenda Packets
>
2021
>
05 - MAY
>
May 24
>
11 - Final Plat - Lots 1&2 Block A CEFCO North Addition
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2021 12:02:04 PM
Creation date
5/20/2021 11:51:00 AM
Metadata
Fields
Template:
AGENDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Planning.1,f eport <br />........... <br />TO: Planning and Zoning Commission <br />FROM: Andrew Mack, AICP Director Planning & Community Development <br />SUBJECT: Revised Preliminary Plat and Final Plat Approval of Lots 1 and 2, Block A of the <br />CEFCO North Addition <br />MTG, DATE: May 03, 2021 <br />BACKGROUND <br />The applicant is requesting simultaneous approval of the revised preliminary plat and the final plat <br />for the redevelopment of the three businesses at the NE quadrant of N. Main and North Loop 286. <br />They are located at 2500, 2510 and 2610 N. Main. The land area contains approximately 3.12 <br />acres. All three sites will be demolished and a new gas & convenience station will be constructed. <br />The station project received a prior SUP approval for construction. The preliminary plat was <br />approved 1 year ago, but the developer was unable to obtain the requested driveway access <br />approval from TxDOT on the Loop frontage road. As a result, the additional site at the intersection <br />was acquired by the applicant in order to close two existing driveway accesses and add an <br />additional 2/3rds of an acre to the total development site. <br />RECOMMENDATION <br />Staff recommends approval of the revised preliminary plat and final plat, subject to the following <br />conditions: <br />1. The property access driveways shall be subject to final approval by TxDOT. <br />2. The contractor shall install the required sidewalk along the roadways prior to receiving a <br />final C/O for the new building. <br />3. The fire hydrants locations shall be relocated and subject to final review and approval by <br />the City Fire Marshall. <br />4. The applicant shall provide a grading and drainage plan for review and approval of the City <br />Engineer and TxDOT as may be required, prior to approval of the final site plan and <br />issuance of building and site construction permits. <br />5. The applicant shall dedicate a 15ft utility easement along front (west) street frontage of the <br />property as requested by ONCOR. <br />6. The applicant shall install approximately 230 lineal feet of full buffer screening along the NE <br />side of the structure in the green space to fully screen the residential apartments to the <br />East in accordance with the buffer screening requirements of Section 30-100 of the Zoning <br />Ordinance. <br />7. Existing and proposed drainage easements shall be required and shown on the final plat <br />prior to recording. <br />8. The applicant shall extend a fire lane access easement across the building frontage. <br />9. The applicant shall provide a finished floor elevation on the site and grading plans prior to <br />final approval by the City Engineer and Building Official. <br />
The URL can be used to link to this page
Your browser does not support the video tag.