My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09 - Love Civic Center Project WRA Architects-Phase I Conclusions Proposed Amendment to Contract for Phase II Work
City-of-Paris
>
City Council
>
Agenda Packets
>
2021
>
07 - JULY
>
July 12
>
09 - Love Civic Center Project WRA Architects-Phase I Conclusions Proposed Amendment to Contract for Phase II Work
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2021 3:46:36 PM
Creation date
7/8/2021 3:42:04 PM
Metadata
Fields
Template:
AGENDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Paris, Texas <br />Love Civic Center <br />Below is a break down of the Probable cost for the HVAC systems only. Indicated are the units broken down by <br />their tonnage and the year of manufacture. Based on the assesment provided by WRA, units older or close to 15 <br />years of life need to be replaced. Units that need to be replaced today are indicated in red and have been included <br />in the total estimate. Other units to be replaced in the near future are indicated by orange and units indicated in <br />green are in good condition and are exempt from replacement. <br />New controls for the entire building have been included in the estimate at the rate of $4.00 per SF of the building. <br />The total estimate indicated here has been added to the total estimate provided in the previous sheets. <br />1 <br />�--_� AA CHITE CTURE9 <br />Co <br />-i p < i S 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.