My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09 - Love Civic Center Project WRA Architects-Phase I Conclusions Proposed Amendment to Contract for Phase II Work
City-of-Paris
>
City Council
>
Agenda Packets
>
2021
>
07 - JULY
>
July 12
>
09 - Love Civic Center Project WRA Architects-Phase I Conclusions Proposed Amendment to Contract for Phase II Work
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2021 3:46:36 PM
Creation date
7/8/2021 3:42:04 PM
Metadata
Fields
Template:
AGENDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Paris, Texas <br />Love Civic Center <br />Mr. Path, <br />Thank you for the opportunity to collaborately partner with the city of Paris in your efforts to effectively <br />plan for meeting current and future municipality facility needs. In close collaboration with the city <br />stakeholders, WRA Architects and Caffey Architecture was tasked to evaluate the current state of the Love <br />Civic Center. <br />The current phase is the first step in the renovation process which recognizes the building's deficiencies as <br />well as the needs of the community. The next phase of the project will be to narrow down the scope and <br />select which renovations are desired in order to stay within the allowable budget. <br />Currently, the City of Paris, TX Love Civic Center is below building code standards and is due for an <br />upgrade to building systems and architectural renovations. The scope of the project was determined <br />based on code requirements, accessibility needs, as well as aesthetic upgrades. After meeting with city <br />representatives, the main areas of focus are restroom upgrades, flooring upgrades, painting, roof repairs, <br />and building security. <br />The following pages in this document give a more detailed look into our findings as well as a cost estimate <br />for the work. <br />Sincerely, <br />Mary O'Brien, AIA, NCARB, LEED AP BD+C <br />Principal, WRA Architects <br />H. <br />y CTURE <br />U�, P it I S4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.