My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09 - Love Civic Center Project WRA Architects-Phase I Conclusions Proposed Amendment to Contract for Phase II Work
City-of-Paris
>
City Council
>
Agenda Packets
>
2021
>
07 - JULY
>
July 12
>
09 - Love Civic Center Project WRA Architects-Phase I Conclusions Proposed Amendment to Contract for Phase II Work
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2021 3:46:36 PM
Creation date
7/8/2021 3:42:04 PM
Metadata
Fields
Template:
AGENDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Paris, Texas <br />Love Civic Center <br />Upon Approval from the city, The Design team will initiate Phase II. The phase II <br />milestones are as follows. Duration and deadlines are to be determined based on <br />approval of Phase I submissions. <br />A. To include a preliminary survey of the project site locating adjacent roads, utilities, drainage patterns, and structures <br />B. Drone video and 3D map generation <br />C. Planning GIS level city map indicating all current properties and facilities <br />D. Space inventory of existing spaces (spreadsheet) <br />A. Develop agreed program and space utilization <br />B. Kick off meeting with consultants <br />C. High level specifications <br />D. Submission of schematic design for approval from stakeholders <br />A. Budget determined based on schematic design <br />B. Review schedule, take corrective action required <br />C. Submission to stakeholders for approval <br />A.Establish design for the project based on schematic design <br />B. specify materials, structural details and cased opening <br />C. Submission to stakeholders for approval <br />A. Finalized design from design development is approved <br />B. Complete set of architectural drawings along with specifications <br />C. Submission to stakeholders for approval <br />D. Submission of drawings to contractors for Bidding and submission to the city for permits <br />A. Attend and participate in all site meeting <br />B. Host owner, contractor and architect meetings through construction <br />C. Maintain and overview construction schedule and work with contractors on providing any additional information <br />CJI <br />E <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.