Laserfiche WebLink
<br />CHANGE <br />ORDER <br />AlA DOCUMENT ClOT <br /> <br />Distribution to: <br /> <br />OWNER <br />ARCHITECT <br />CONTRACTOR <br />FIELD <br />OTHER <br /> <br />Kl <br />Kl <br />Il9 <br />o <br />o <br /> <br />PROJECT: Paris Public Library <br />(name. address) 326 S. Main <br />Paris, TX 75460 <br /> <br />TO (Contractor): <br /> <br />r:;:udley Moore Construction compan;l <br />P.O. Box 595 <br />Sulphur Springs, TX 75482 <br /> <br />CHANGE ORDER NUMBER: 1 <br /> <br />INITIATION DATE: 3/24/87 <br /> <br />ARCHITECT'S PROJECT NO: 17.64 <br /> <br />CONTRACT FOR: <br /> <br />Lump sum <br /> <br />L <br /> <br />.-l CONTRACT DATE: <br /> <br />8/11/86 <br /> <br />You are directed to make the following changes in this Contract: <br /> <br />Add overhead door, masonry pilasters, rework grade beam as per revised drawings 1-5. <br /> <br />~ot VJlid until signed by both the O\\ncr and Architect. <br />Sign.lturc of the Contractor indicates his ,lgr('('lncnt hercwith, includin~ any adjustment in the Contract Sum or Contract Time. <br /> <br />The original (Contract Sum) (Guaranteed Maximum Cost) was. . . . . . . . . . . . . . . . . . . . . . . . . .. $ <br />Net change by previously authorized Change Orders.. . .. ..... . . . ... . . . . . .... . . .. .. .. .. $ <br />The (Contract Sum) (Guaranteed Maximum Cost) prior to this Change Order was .......... $ <br />The (Contract Suml (Guaranteed Maximum Cost) will be (increased) (decreased) (unchanged) <br />by dlj~ CllrJllbt: Order......................................................... $ <br />The new (Contract Sum) (Guaranteed Maximum Cost) including this Change Order will be . .. $ <br />The Contract Time will be (increased) (decreased) (unchanged) by <br />The Date of Substantial Completion as of the date of this Change Order therefore is <br /> <br />702,100., <br />-0-; <br />702,100., ' <br /> <br />6,275.' <br />708,375. <br />4 ) Days, <br /> <br />W.\\,a ... <br />ARCHITECT <br /> <br />tfl, ll.ill~ Gal ~IA <br /> <br />July 18,1987 <br />Authorized: <br />Audlev Moore Construction Companv <br />LO~T""CTQR OWNER <br />P .v. !JOX 595 <br />Address <br />Sulphur Springs, TX 75482 <br />/ -./ <br /> <br />.' /A4../' /-;> <br />BY .-:.,..-------- -~~.~ <br />" 1/ <br />!oATE ,:/' March 24, 1987 <br /> <br />Address <br /> <br />Address <br /> <br />~~~ <br /> <br />OATE <br /> <br />BY <br /> <br />DATE <br /> <br />AlA DOCUMENT G701 CHANGE ORDER APRIL 1978 EDITION AI/\@ @ 1978 <br />THE t\,\\ERICA:-.l I:-.lSTITUTE OF ARCHITECTS. 17J:') MW YORK IWE.. N.W.. \\!,\SHINCTC):"-l. D,C. :!OOO(1 <br /> <br />G701 - 1978 <br />