My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1987-033-RES WHEREAS, the City Council of the City of Paris did heretofore, in Resolution No. 86-001, award the
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
1930-1999
>
1980-1989
>
1987
>
1987-033-RES WHEREAS, the City Council of the City of Paris did heretofore, in Resolution No. 86-001, award the
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2006 4:34:24 PM
Creation date
6/1/2005 9:15:54 AM
Metadata
Fields
Template:
CITY CLERK
Doc Name
1987
Doc Type
Resolution
CITY CLERK - Date
3/25/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />City of Paris <br />P.O. BOX 1037 n PARIS, TEXAS 75460 CHANGE ORDER # 8 <br /> <br />PROJECT TITLE Additions to Hater Treatment Plant <br />PROJECT NO. 82.10A CONTRACT NO. 15-82-10-0340 CONTRACT DATE 1- B-R/; <br />CONTRACTOR Heritage Constructors. Inc. <br /> <br />The following changes are hereby made to the Contract Documents: <br />CHANGES TO CONTRACT AMOUNT <br />ADDITIONS: - <br />1. Alternate Temporary Backwash Installation. . . . . . . . . . <br />2. Additional Support Braces for Piping in Sedimentation Basins. <br />3. Concrete Reinforcing Dowels for Backwash Trough. . . . . . . <br />4. Adjustment to Elevation of Sedimentation Basin Sludge Manhole <br />5. Concrete Reinforcing Dowels for Filter Pipe Gallery Roof Deck. . . . <br />6. Reconstruct Failed Portions of High Service Pumpage Metering Manhole. <br />7. Two 450-24" Diameter Bends to Mitigate Grade Conflict Between Proposed <br />24" Supernatant Pipe and Existing Buried Piping . <br />8. Electrical Circuits Necessary to Power Heat Trace <br />(Electrique Items 3, 6, 8 & 9) <br />9. Power and Control Circuit for Ammoniator <br />10. Starter for Blower Motor on Lime Silo <br /> <br />DEDUCTIONS: <br />1. Delete Proposal Item-2 (Filter Tile) .... <br />2. Delete Excess Conduit Allowance Provided in Item-l <br />(Per Item-7 of Addendum-3) <br />3. Delete 540 L.F. of Grout Replacement . . . . <br /> <br />Total Contract Price Increase Due To This Change Order. <br />Contract Amount Prior To This Change Order . . . . . . <br />New Contract Amount Resulting From This Change Order . <br /> <br />$2,558 <br />145 <br />780 <br />600 <br />240 <br />2,185 <br /> <br />778 <br />1,885 <br /> <br />1,408 <br />1,354 <br /> <br />(3,300) <br />(4,500) <br /> <br />(48(1) <br />3,654 <br />3,104,899 <br />3,108,553 <br /> <br />CHANGES TO CONTRACT TIME <br />Increase Contract Time By 1 (one) Day for Installino Surface Wash Supports in <br />Sand Filters <br />Increase Contract Time Bv 3 (three) Days for Reconstructing the High Service <br />Pumpage Metering Manhoie <br />Total Contract Time Increase Due To This Change Order 4 Days <br />Contract Period Prior To This Change Order . . . . . 365 Davs <br />New Contract Period Resultino From'This Chanqe Order 369 Days <br />New Contract Completion Date . . . . . . . . . . . March 5, 1987 <br />OTHER CHANGES <br />Contractor is authorized to proceed with increasing size of high service pump <br />suction piping by Method C as specified in General Provisions, Part 6.03. <br /> <br />Requested by <br /> <br />date <br /> <br />Recommended by I <br />~~' . ecto~f En g2,r1ee. ring <br />Ordered by ___~...J!t' <br />1 ur e , Mayor <br />Accepted by <br />Dennls Smlth: Herltage constructbrs, Inc. <br /> <br />date <br /> <br />date <br /> <br />dlte <br /> <br />Form 15.3 <br /> <br />6.d :",of "',4/1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.