Laserfiche WebLink
Item No. 9 <br />Code Enforcement Report: Jul 2021 <br />Cases Worked: 419 <br />Cases Completed: 464 <br />Initial Inspections: 441 <br />Re -inspections: 480 <br />Total Inspections: 901 <br />Lots Abated: 171 <br />Other Work by Abatement Crew: <br />Tree & Brush Removal — 2 days <br />Removed Tires — 3 days <br />Removed Illegal Dumps — 3 days <br />Repaired/Serviced Equipment — 3 days <br />Worked Downtown — 3 days <br />Blind Corners — 3 days <br />Building and Standards Report: Jul 2021 <br />There were 6 structures presented to the Building and Standards Commission: <br />503 W Washington <br />430 E Washington <br />151 SE 23rd <br />265 NE 22nd <br />2205 Pine Bluff <br />2200 Elk Hollow Road <br />There were no structures demolished in July, 2021. <br />