My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1987-080-RES WHEREAS, the City Council of the City of Paris did heretofore, in Resolution No. 86-077, award the
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
1930-1999
>
1980-1989
>
1987
>
1987-080-RES WHEREAS, the City Council of the City of Paris did heretofore, in Resolution No. 86-077, award the
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2006 4:34:28 PM
Creation date
5/31/2005 3:59:56 PM
Metadata
Fields
Template:
CITY CLERK
Doc Name
1987
Doc Type
Resolution
CITY CLERK - Date
8/10/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />--- <br /> <br />CHANGE <br />ORDER <br />AlA DOCUMENT G10l <br /> <br />Distribution to: <br />OWNER 0 <br />ARCHITECT 0 <br />CONTRACTOR 0 <br />FIELD 0 <br />OTHER 0 <br /> <br />PROJECT: Paris Public Library Additions <br />(name, address) <br /> <br />CHANGE ORDER NUMBER: 7 <br /> <br />TO (Contractor): <br /> <br />INITIATION DATE: 6/25/87 <br /> <br />I "I <br /> <br />Audley Moore Construction Company <br />P.O. Box 595 <br />EPhur Springs, TX .75482 -.J <br /> <br />ARCHITECT'S PROJECT NO: 17.64 <br />CONTRACT FOR: Lump sum <br /> <br />CONTRACT DATE: 8/11/86 <br /> <br />You are directed to make the following changes in this Contract: <br /> <br />#1 - Remove basement concrete floor as needed to replace existing bathroom sewer line with 4" <br />PYC connected to new sewer line, also run separate 4" PYC line from existing floor drain <br />connected to old sewer line. <br /> <br />ADD 1,309.00 <br /> <br />#2 - Add 20' x 5' alum "W" pans canopy with fascia and scuppers, wall braces 3' on center. <br /> <br />ADD 994.00 <br /> <br />Not valid until signed by both the Owner and Architect. <br />Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time. <br /> <br />The original (Contract Sum) (Guaranteed Maximum Cost) was.. . . .... ... ... ... .......... $ <br />Net change by previously authorized Change Orders . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . .. $, <br />The (Contract Sum) (Guaranteed Maximum Cost) prior 10 this Change Order was.... ... ... $ <br />The (Contract Sum) (Guaranteed Maximum Cost) will be (increased) (decreased) (unchanged) <br />by this Change Order ......................................................... $ <br />The new (Contract Sum) (Guaranteed Maximum Cost) including this Change Order will be ... $ <br />The Contract Time will be (increased) (decreased) (unchanged) by <br />The Date of Substantial Completion as of the date of this Change Order therefore is <br /> <br />702,100. <br />13,861. <br />715,961. <br /> <br />2,303. <br />718,264. <br />7) Days. <br /> <br />~~~J!r'. <br /> <br />DATE <br /> <br />Audlev Moore Construction <br />CONTRACTOR <br />P.O. Rox 595 <br />Address <br />Sulphur Springs, T,X 75482 <br /> <br />.-/ 4" ~ ..,..- ,". <br />BY . '!!- ---....-- ~...- ....'. <br />/ .' ... v'/) <br />'OATf' ,.:.- -::" -'J "/ <br /> <br />Authorized: <br />City of Paris <br /> <br />William Lil!:htfoot <br />ARCHITECT <br /> <br />OWNER <br /> <br />Address <br /> <br />Address <br /> <br />BY <br />DATE <br /> <br /> <br />AlA DOCUMENT G7.1 . CHANGE ORDER . APRil 1978 EDITION . AlA- . ~ 1978 <br />THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W., WASHINGTON, D.C. 2000r. <br /> <br />G701 -1978 <br />
The URL can be used to link to this page
Your browser does not support the video tag.