My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
19 - Renewing the Landfill Services Agreement with Waste Connections, Inc.
City-of-Paris
>
City Council
>
Agenda Packets
>
2021
>
09 - SEPTEMBER
>
September 13
>
19 - Renewing the Landfill Services Agreement with Waste Connections, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2021 2:32:09 PM
Creation date
9/9/2021 2:31:49 PM
Metadata
Fields
Template:
AGENDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
b. The specific requirements. of the Special Waste agreement shall be as <br />specified from time to time by Contractor and may be, altered by Contractor at <br />any time as necessary to ensure the proper management of Special Waste. At <br />a minimum, the Special Waste agreement shall include: <br />A representation ofthe character and regulatory status ofthe waste to be <br />executed by the generator; <br />ii. A decisi'o'n document to be executed by Contractor. A decision <br />document shall at aminimum include the identification of the generator <br />and the source and. characterization of the waste; <br />iii. A proposed management plan for the Special Waste, including any <br />special. handling requirements; <br />iv. The approval of Contractor indicating acceptance for handling ofthe. <br />waste; and <br />v. The unit price for disposal associated with the management of the <br />Special Waste. <br />C. Contractor may, in its sole discretion, demand that a representative sample of. <br />any Special Waste proposed for delivery to the Landfill be provided by the <br />generator to Contractor prior to the approval of a Special Waste agreement. <br />Unless otherwise agreed by Contractor, the cost for,acquisition, delivery and <br />analysis of a representative sample shall be borne by :the generator. If the <br />generator refuses to provide a representative sample, Contractor shall have no <br />obligation to accept the Special Waste or to execute a Special Waste <br />agreement. <br />19. Sunday & Holiday Operation. City and Contractor hereby acknowledge and <br />agree that operation of -the Landfill on Sundays and on the following holidays shall <br />be limited to emergency situations as required by City, the State or other <br />recognized authorities. <br />Christmas Day <br />19. Delivery of Waste. City agrees; acknowledges and confirms that during the term of <br />this Agreement or any extensions thereof, the City shall deliver to the Landfill for <br />disposal all such residential Waste Materials, save and except materials being <br />mulched, composted and/or recycled by or through the City or the City's agent. In <br />addition, if the City shall engage or utilize, or otherwise contract for the services of, <br />a third party to collect residential Waste Materials, the .City shall require that all <br />such residential Waste. Materials collected by such third party provider shall be <br />delivered to and disposed of at the Landfill. In addition, the City shall deliver to the <br />Landfill all construction and demolition material from all residential or commercial <br />structures condemned and demolished by the City or agent of the, City. <br />Landfill Services Agreement - Page 9 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.