Laserfiche WebLink
<br />EXHIBIT B <br />1987 CENTRAL INTERCEPTOR REHABILITATION <br /> <br />PHASE I <br /> <br />COST ESTIMATE <br /> <br />MATERIALS <br /> <br />27" Polyethylene Pipe <br /> <br />48" Dia. Po1yethe1ene M.H. <br />Bedding Materials <br /> <br />Concrete Encasement <br /> <br />Road Bore or Crossing Casement <br />48" Dia. Concrete M.H. <br /> <br />LABOR <br /> <br />Trenching, Bedding, Backfill <br /> <br />Build (4) Poly M.H. <br /> <br />Place Concrete Encasement <br /> <br />Build (2) Concrete M.H. <br /> <br />Mobilization Dewatering <br /> <br />8710COST.EST <br /> <br />EST,QUAN, <br /> <br />2,400 L.F. <br /> <br />58 L.F. <br />800 C.Y. <br /> <br />120 C.Y. <br /> <br />55 L.F. <br />28 L.F. <br /> <br />TOTAL MATERIALS <br /> <br />2,400 L.F. <br /> <br />8 Hr. <br /> <br />8 Hr. <br /> <br />8 Hr. <br /> <br />TOTAL LABOR <br /> <br />TOTAL PROJECT <br /> <br />UNIT TOTAL <br />PRICE PRICE <br /> <br />23.50 56,400 <br />115.00 6,670 <br />16.00 12,800 <br /> <br />45.00 5,400 <br />30.00 1,650 <br />50.00 1,400 <br /> <br />84,320 <br /> <br />22.00 <br /> <br />52,800 <br />680 <br /> <br />85.00 <br /> <br />85.00 <br />85.00 <br /> <br />680 <br /> <br />680 <br /> <br />2,000 <br /> <br />56,840 <br /> <br />$141,160 <br />