Laserfiche WebLink
<br />EXHIBIT B <br />1987 CENTRAL INTERCEPTOR REHABILITATION <br />PHASE II <br /> <br />COST ESTIMATE <br /> <br /> UNIT TOTAL <br />MATERIALS EST.QUAN. PRICE PRICE <br />27" Polyethylene Pipe 1,000 L.F, 23.50 23,500 <br />48" Dia. Concrete M.H. 50 L.F. 50.00 2,500 <br /> TOTAL MATERIALS 26,000 <br />LABOR <br />Trenching, Bedding, Backfill 1,000 L.F. 15.80 15,800 <br />Build (3) Concrete M.H. 50 L.F. 20.00 1,000 <br />Diversion Dewatering, Tapping Lump Sum 2,000 <br />Cleanup and Testing 1,000 L.F. 2.00 2,000 <br /> <br />TOTAL LABOR <br /> <br />20,800 <br /> <br />TOTAL PROJECT <br /> <br />$ 46,800 <br /> <br />8710COST. II <br />