Laserfiche WebLink
Item No. 8 <br />Code Enforcement Report: September, 2021 <br />Cases Worked: 319 <br />Cases Completed: 378 <br />Initial Inspections: 312 <br />Re -inspections: 361 <br />Total Inspections: 663 <br />Lots Abated: 136 <br />Other Work by Abatement Crew: <br />Tree & Brush Removal — 4 days <br />Removed Tires —1 days <br />Removed Illegal Dumps — 4 days <br />Repaired/Serviced Equipment — 2 days <br />Blind Corners — 5 days <br />Building and Standards Report: September, 2021 <br />There were 8 structures presented to the Building and Standards Commission: <br />265 NE 22nd <br />2205 Pine Bluff <br />1427 Graham <br />647 NW 10th <br />1202 W Cherry <br />335 SE 7th <br />1904 E Cherry <br />1330 NE 20th <br />There were 5 structures demolished in September, 2021. <br />948 SE 5th <br />956 SE 5th <br />704 SE 23rd <br />628 W Austin <br />1036 NW 13th <br />