My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
17 - Downtown Square Short-Term Traffic Stop Plan Project
City-of-Paris
>
City Council
>
Agenda Packets
>
2021
>
10 - OCTOBER
>
October 25
>
17 - Downtown Square Short-Term Traffic Stop Plan Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2021 11:10:33 AM
Creation date
10/21/2021 11:00:21 AM
Metadata
Fields
Template:
AGENDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ueiii tCe ii ii�ii-5I..11ii�� <br />�ii�� I���iiux� <br />III ��~ru u��u.vul III "iuu"uii�:�= <br />� �I . ..----- ....uw.. <br />qi u u iu ��.V II �u� .�..M Vie,.., <br />DOWNTOWN PLAN GOALS & RECOMMENDATIONS <br />The following goals and implementation recommendations in the downtown plan were <br />adopted by the City Council with the update of the Comprehensive Plan on 10/8/2018. As you <br />will see, a number of these measures have been implemented except for the key identified <br />objectives for slowing speed and reverting the one-way pair system back to a two-way system. <br />TRAFFIC MANAGEMENT to CREATE PEDESTRIAN -FRIENDLY SPACES <br />2.1 Reduce and enforce speed limits adjacent to the FUMC'S community spray park. <br />2.2 Reduce and enforce lower speed limits adjacent to Market Square. <br />2.3 Convert the travel lane adjacent to FUMC on Clarksville to parallel parking. <br />2.4 Reduce lane widths on Plaza, Lamar, and Clarksville. <br />2.5 Establish parallel parking on both sides of each street entering and leaving the Plaza, for a minimum distance <br />of one block in each direction. <br />2.6 Utilize bump -outs and hardscape to enhance pedestrian crossings at each intersection on the plaza. 2.7 <br />Close one block of 3rd between Lamar and Clarksville, replace asphalt paving with pavers, and place bollards <br />on either end to prevent regular access, but also to provide for limited vehicular access for special events and <br />occasions. In the interim, provide enhanced crosswalks in conjunction with the 3rd Street repaving project. <br />2.8 In order to reduce the number of large trucks, improve No Through Truck & hazardous cargo signage, and <br />maintain police enforcement of existing restrictions on such trucks. <br />2.9 Incorporate Paris Metro stops into downtown's function and design, and provide assistance to ATCOG in <br />placement of appropriate signage and construction of bus shelters. Evaluate constructing a non-standard <br />downtown shelter from materials that more fit the historical character of downtown. <br />2.10 Construct two bump -outs each on 1 st SW and South Main south of Sherman, each pair to be opposite from <br />one another to create a traffic calming chicane effect. <br />2.11 Construct enhanced pavement pedestrian crossings at each Plaza intersection, on 1st SW connecting the <br />library and Market Square, at the intersections of Church and Kaufman, on Main Street connecting Bywaters <br />Park and the Library, and at 1st NE and Lamar. <br />2.12 Replace all faded, damaged, or otherwise dated wayfaring signs with new -design signage. Eliminate <br />unneeded locations to reduce street clutter. <br />2.13 Construct landscaped traffic circles at the intersections of North Main and Pine Bluff, and 1st NW and <br />Graham; coordinate improvements with landscaping and other improvements to be established along northern <br />edge of courthouse property. <br />2.14 Convert Price, Houston, 2nd West, and 3rd West to two-way traffic; identify and convert additional streets <br />as appropriate. <br />2.15 Expand the size of the Culbertson Fountain plaza approximately 6 feet on each side, using a pervious <br />material (e.g. decomposed granite, softscape, pavers, etc.). Widen existing sidewalks on the plaza by from 3 to <br />5 feet, using a pervious material. <br />2.16 Replace traffic signals on each plaza corner with stop signs. <br />2.17 Demolish former police station (and retrieve old tower for reuse/resale), as well as neighboring properties <br />as necessary, and construct a heavily landscaped new Y intersection of Grand and Bonham in that location; <br />prior to construction, utilize space for a temporary, highly landscaped passive park. <br />Issues Analysis <br />The main issue with the current traffic movements on the TX DOT roadway system is that it <br />is designed to move traffic efficiently and as quickly as possible through the downtown square; <br />in conjunction with the traffic signal system that is timed and sequenced to move traffic along <br />the system at the 30 mile per hour speed limit in all directions to and from the square. The <br />newly adopted objective by the City Council in 2018 was to slow this traffic down to improve <br />the following: <br />Page 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.