My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
14 - Three-year renewal contract with Sanitation Solutions for demolition & debris removal
City-of-Paris
>
City Council
>
Agenda Packets
>
2021
>
12 - DECEMBER
>
December 13
>
14 - Three-year renewal contract with Sanitation Solutions for demolition & debris removal
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2021 3:55:27 PM
Creation date
12/9/2021 3:25:23 PM
Metadata
Fields
Template:
AGENDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
fflylflla� <br />A. Each Work Order shall provide for one-time specific demolition required by OV%rNER for <br />property management and enforcement on a specified property. Exact demolition <br />specifies shall be provided in each Work Order. <br />B. CONTRACTOR shall be responsible for the safety of personnel and operations. <br />CONTRACTOR shall provide appropriate safety warnings for the protection of the work <br />area. Provision of safety includes use of appropriate barricades, traffic control, control of <br />the use of equipment near traffic or pedestrians, and provision of other controls and <br />warnings as needed or as specified by the Work Order. <br />C. Because time is of the essence in the filing of liens after demolition, Work Orders should <br />be returned to OWNER immediately upon completion of demolition. Work Orders will <br />not be considered CONTRACTOR's bills they are used solely for the purpose of advising <br />CONTRACTOR of the nature of work necessary at each location and for assisting <br />OWNER in nR liens. <br />A. Demolition shall include the removal of pnly those exact items specifically set out in the <br />Work Order. <br />B. Overall saii5ty and adverse impact to the neighborhood shall be considered a priority. <br />CONTRACTOR shall provide demolition within hours which are reasonable to the <br />conditions of the neighborhood, be cognizant and make provisions to control excessive <br />dust, and secure the area for the overall safety of operations as is defined within these <br />Specifications. CONTRACTOR shall not leave the work site when portions of a structure <br />or other items are in a dangerous condition. Such conditions may require posting a guard <br />or continuing the demolition until the condition is relieved. <br />C. Demolition shall follow good construction practices. It is the intent of OWNER to remove <br />the standing hazard as quickly as possible, and CONTRACTOR should attempt to satisfy <br />this. This may involve the processes of pushing, breaking, or otherwise reducing standini� <br />components into a pile or piles of de4ris. <br />the surrounding neighborhood. <br />M <br />
The URL can be used to link to this page
Your browser does not support the video tag.