My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-048 - Approving a Three-Year Renewal Contract with Sanitaiton Solutions, INC in the amount of $36.63 per ton for demolition and debris removal of condemned structures
City-of-Paris
>
City Clerk
>
Resolutions
>
2021
>
2021-048 - Approving a Three-Year Renewal Contract with Sanitaiton Solutions, INC in the amount of $36.63 per ton for demolition and debris removal of condemned structures
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2021 4:23:45 PM
Creation date
12/14/2021 4:23:33 PM
Metadata
Fields
Template:
CITY CLERK
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. Equipment and tools left on the property are the responsibility of CONTRACTOR. <br />OWNER shall not be responsible for theft, damage, or adverse use of the equipment. <br />E. Mature and protected trees found on a property shall be protected. Contractors shall work <br />around the tree carefully to prevent damage to the tree and its root system. Sapling trees <br />and sprouts may be removed only if they are found in a path needed for access to the <br />structure. <br />1.03 TRASH AND RUBBISH REMOVAL BY CONTRACTOR (WHEN SPECIFIED IN <br />BID FORM <br />A. Additional waste material shall be removed from the property and disposed of by <br />CONTRACTOR only if specified in a Work Order. CONTRACTOR shall not deviate <br />from the Specifications, shall not utilize waste removal processes that are contrary to good <br />practices or State law, and shall not utilize removal of -waste to an unapproved site location. <br />Proof of proper disposal of all waste materials, including demolition debris, must be <br />submitted upon completion by providing the OWNER with approved landfill tickets <br />at the time of monthly billing. <br />B. OWNER reserves the right to recycle prior to or during actual demolition. This may <br />include removing useable structural elements, removing or separating furnishings, <br />shingles, and other waste components. This will be done by OWNER at its expense prior <br />to issuance of a Work Order. <br />C, OWNER reserves the right to approve any method for controlling and removing the waste. <br />This may involve using on-site containers, grinding the material to reduce the waste, or <br />providing that CONTRACTOR transport the waste to a City and TCEQ approved landfill. <br />Bidders should specify intent and include the cost of such disposal method in its Bid. <br />D. Junk, trash, and rubbish type material shall be removed from property only when <br />specifically provided by the Work Order. All such material shall be disposed of properly <br />at a sanitary landfill or as otherwise specified. <br />E. Minor litter shall be cleaned and removed as a part of the total bid on any project. <br />This type of work shall include the removal of any debris by any means and shall be <br />removed as is necessary utilizing hand work or the use of machinery. <br />Special attention shall be made to remove small articles, stone, metal, wire, and other <br />similar objects which could become a hazard if thrown by a shredder or mower. <br />F. Properties which have rubbish or waste which requires special handling may have specific <br />instructions for the removal and/or disposal of the material provided in the Work Order. <br />23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.