<br />PARIS, TEXAS <br />1985 MASTER PUMP STATION 1 <br />REHABILITATION PROJECT <br /> <br />CHANGE ORDER NO, 1 <br /> <br />I. SCOPE. This Change Order No. 1 provides for the deletion of the <br />screening equipment in the wetwell. <br /> <br />II. REASON FOR CHANGE. Yhen the wetwell was drawn down for installation of <br />the screen the invert elevation of the 30 inch sewer was lower than expected. <br />The sewer invert was actually at the top of the concrete fillet. In order to <br />install the screen major demolition of the fillet would be required.: Also, <br />with the pipe being lower in the wetwell, the basket would be completely <br />submerged, allowing floatables to enter the wetwell. Since full advantage of <br />the screenging device can not be recognized, it is recommended that it be <br />deleted. <br /> <br />III. BASIS FOR CHANGE. Due to the above change, the Contract Amount shall <br />be decreased as-follows: <br /> <br />Total Change in Contract Amount <br />Original Contract Amount <br />Previous Change Orders <br /> <br />1,000. <br />278,000. <br />0, <br /> <br />New Contract Amount Including This <br />Change Order <br /> <br />277,000. <br /> <br />ALL OTHER PROVISIONS OF THE CONTRACT REMAIN THE SAME. <br /> <br />AGREED to this <br /> <br />day of <br /> <br />, 1986. <br /> <br />Recommended By: <br /> <br />City of Paris, Paris, Texas <br /> <br />aJK~ <br /> <br />Black & Veatch <br /> <br />By <br /> <br />Title <br /> <br />Heritage Constructors, Inc. <br />By A--... ~L <br />Tit:&: p(2.~'5Ii)e"'f <br /> <br />(PARIS, TEXAS) <br />(11967 ) <br /> <br />1 <br />