My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1986-109-RES WHEREAS, the City Council of the City of Paris did heretofore, in Resolution No. 86-001, award the
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
1930-1999
>
1980-1989
>
1986
>
1986-109-RES WHEREAS, the City Council of the City of Paris did heretofore, in Resolution No. 86-001, award the
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2006 4:34:46 PM
Creation date
6/1/2005 11:49:22 AM
Metadata
Fields
Template:
CITY CLERK
Doc Name
1986
Doc Type
Resolution
CITY CLERK - Date
10/20/1986
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />...11, <br /> <br />~~]& Ci(y of Paris <br /> <br />"-".... '-~'\', . P,O. BOX 1037 I I PARIS, TEXAS 75t60 <br /> <br />CHANGE ORDER # 5 <br /> <br />82.10 <br /> <br />CONTRACT NO. <br /> <br />Heritage Constructors, Inc. <br /> <br />Plant <br />15-82-10-0340 <br /> <br />CONTRACT DATE 1-13-86 <br /> <br />PROJECT TIT LE <br />PROJECT NO. <br />CONTRACTOR <br /> <br />Additions to l'later Treatment <br /> <br />The 1ollowing ch(:lnge~ are hcrcby made to the Conlract Documents: <br /> <br />1. Removal of concrete at the footings of the existing filters which <br />interfered with installation of the new filter drain piping, as described <br />in the contractor's letter of September 18, 1986. <br /> <br />Contract price will be increased by.... .... ................$456.00 <br /> <br />2. Installation of reinforcing steel dowel bars for connection of the new <br />filter gallery wall to the existing structure, as described in the <br />contractor's letter of Auqust 15, 1986. <br /> <br />Contract price will be increased by................. .......$288.00 <br /> <br />3. Addition of a 5 degree grade adaptor in the 33-Inch Water Main to allow <br />crossing the existing 20-inch main at the south end of the plant site, as <br />described in the contractor's letter of August 11, 1986. <br /> <br />Contract price will be increased by....................... .$907.00 <br /> <br />4. Removal of buried concrete slab located west of Maxey Plant, as described <br />in the contractor's letter of September 18, 1986. <br /> <br />Contract price will be increased by ........................$1,085.00 <br /> <br />5. Delete handrail at the new rapid mix and blendin9 tanks and modify and <br />install the handrail material at the new filters, as described in the <br />contractor's letter of September 18,1986. <br /> <br />Contract price will be increased by ........................$300.00 <br /> <br />Total contract price increase due to this Change Order......$3,036.00 <br />Contract price prior to this Change Order...................$3,074,219.00 <br />New contract price due to this Change Order.................$3,077,255.00 <br /> <br />Change to Contract Time : None <br /> <br />Requested by Cit <br /> <br /> <br />diite <br /> <br />Recommended by <br /> <br />date <br /> <br />ng1 neerl ng <br /> <br />Ordered by <br /> <br />date <br /> <br />Sllly Joe Burnett, Mayor <br /> <br />Accepted by <br /> <br />date <br /> <br />Joe LaRue, Heritage Constructors, Inc. <br /> <br />Form 15.3 <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.