My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12 - Wastewater Treatment Plant Project Presentation
City-of-Paris
>
City Council
>
Agenda Packets
>
2022
>
04 - APRIL
>
April 11
>
12 - Wastewater Treatment Plant Project Presentation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2022 12:47:47 PM
Creation date
4/7/2022 12:44:44 PM
Metadata
Fields
Template:
AGENDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item No. 12 <br />Memorandum <br />TO: Mayor, Mayor Pro Tem and City Council <br />Grayson Path, City Manager <br />Robert Vine, Assistant City Manager <br />FROM: Doug Harris, Director of Utilities <br />SUBJECT: WASTEWATER TREATMENT PLANT PROJECT PRESENTATION <br />DATE: April 11, 2022 <br />BACKGROUND: <br />The Agreement for Professional Services contract with Garver, for the wastewater treatment <br />facility comprehensive rehabilitation project, was approved by City Council at the February 8, <br />2021 meeting. On October 11, 2021, Lance Klement, P.E., Garver Project Manager, provided a <br />presentation to City Council pertaining to progress of the project and the plans moving forward. <br />The Garver presentation, at the October 11 th meeting, included the preliminary design report, front- <br />end specifications and contract documents, and 30% completion of engineering drawings. <br />STATUS OF ISSUE: <br />Much work has been completed since City Council was last briefed on progress of the project. <br />Monthly planning workshops and design coordination meetings have continued in conjunction <br />with Utilities Department staff and the Garver engineering team, and will continue until the <br />engineering design phase is complete. Currently, 90% of engineering design has been achieved, <br />with 100% completion anticipated on May 20, 2022. The Garver team will be presenting a <br />progress update and current status of the wastewater treatment plant project to City Council, <br />providing information on the next steps to be expected. <br />BUDGET: <br />None; presentation only. <br />RECOMMENDATION: <br />Not an action item; presentation only. <br />
The URL can be used to link to this page
Your browser does not support the video tag.