Laserfiche WebLink
Item No. 9 <br />Code Enforcement Report: March 2022 <br />Cases Worked: 246 <br />Cases Completed: 261 <br />Initial Inspections: 257 <br />Re -inspections: 165 <br />Total Inspections: 412 <br />Lots Abated: 13 <br />Other Work by Abatement Crew: <br />Tree & Brush Removal — 2 days <br />Removed Tires — 9 days <br />Removed Illegal Dumps —10 days <br />Repaired/Serviced Equipment —1 days <br />Building,and Standards Report: March 2022 <br />7 structures were presented to the Building and Standards Commission: <br />904 Cedar <br />1031 Grove <br />1050 SE 17th <br />651 SE 12th <br />1830 W Washington <br />725 Jackson <br />560 E Washington <br />There were 2 structures demolished in March, 2022: <br />431 NE 1st <br />541 NE 6th <br />