Laserfiche WebLink
<br />users by LC'Y1SD engaged in industrial heavy man- <br /> <br /> <br />ufacturing activity not purchasing waCer from <br /> <br /> <br />LCWSD as of the effective date of this contract in <br /> <br /> <br />the event that the consumption of such water by <br /> <br /> <br />such end user exceeds an annual average of 100,000 <br /> <br /> <br />gallons per month. <br /> <br /> <br />C. FollO\-ling the interim period set out above <br /> <br /> <br />and continuing until expansion of Pat Mayse Raw Water <br /> <br /> <br />Transmission Facilities, and subject to the safe avail- <br /> <br /> <br />ability of ra>-l water at the Water Treatment Plant the City, <br /> <br /> <br />,Jill guarantee to LC'YISD 1,150 million gallons per year <br /> <br /> <br />(3,150,000 gallons per annual average day of potable water), <br /> <br /> <br />of which not to exceed 1,400,000 gallons per day may be <br />taken through the City's distribution system. This increased <br />distribution system requirement of LCHSD shall be met by <br />City no later than July 1, 1987, unless provisions of the <br />July 17, 1967, contract as amended by Paragraph I B hereof <br />are reinstaced. The City may require that all amounts of <br />water be taken at a uniform rate that does not exceed 21% of <br />the raw water safely available at the Water Treatment Plane <br />or 2,188 gallons per minute, vvhichever is greater. In the <br />event the City has the safe capacity to deli.ver to its <br />customers and other customers an amount i.n excess of <br />15,000,000 gallons of potab le water per day, the City will <br />make available to LCWSD an amount not to exceed 21% of such <br /> <br />5 <br /> <br />~. <'""""""'------- <br />