Laserfiche WebLink
<br />No other party in any way connected with or employed by Owner shall have <br />authority to make changes in the Scope of Work. <br /> <br />Engineer designates Jay Hesby, or his successor, as its representa- <br />tive in connection with this Contract. Engineer's representative shall <br />reply in writing to such written notice from Owner for changes in the <br />Scope of Work to be performed within ten (10) days after receipt thereof <br />and shall include Engineer's opinion as to a proper guaranteed maximum <br />sum addition or deduction. The Engineer's opinion of cost shall incor- <br />porate all provisions, if any, in Appendix B which relate to compen- <br />sation for supplemental or additional services, or the deletion of <br />services from the agreed scope of work, Owner's and Engineer's mutual <br />agreement is requi red to a Guaranteed Maximum Contract Sum adjustment, <br />and Owner's written notice to proceed must be sent to Engineer before <br />any changes that affect the Guaranteed ~laximum Contract Sum shall be <br />made, The Guaranteed t'laximum Contract Sum is to be adjusted by a <br />Contract Change Order, issued and signed by both parties. All changes <br />sha 11 become pal't of thi s Agreement and sha 11 be executed under the pro- <br />visions of the original Contract Documents. <br /> <br />Incidental design decisions which modify the detailed Scope of Work <br />as given in Appendix A, may be made by Engineer without a Contract <br />Change Order, provided such modifications do not result in an addltion <br />to or deduction from the Guaranteed Maximum Contract Sum, <br /> <br />~RTICLE V - Ownership of Engineering Documents <br /> <br />The "Eng i neeri ng Documents" i nc 1 ude a 11 documents requ i red or <br />reasonably i"lplied by the Scope of \,ork, including but not limited to <br />prints, mylars, plans, tracings, drawings, designs, design premises, <br />calculatiolls, sketches, models, reports, specifications, and Technical <br />Provisions, <br /> <br />All Engineering Documents furnished to Engineer by Owner, in <br />furtherance of this Contract, are the property of Olmer and are not to <br />be used on other work by Engineer and shall be returned to Owner at the <br />conclusion or termination of the Contract. <br /> <br />All Engineering Documents prepared and/or furnished by Engineer in <br />the performance of this Contract are the property of Owner. Engineer <br />s ha 11 de liver such Engi neeri ng Documents to Owner a t the conc 1 us i on or <br />termination of the Contract, Such Engineering Documents will be relied <br />upon by Ol-mer so long as the City of Paris Plant, which they modify, <br />remains in service. Such Engineering Documents are not intended or <br />represented to be suitable for reuse by Owner or others on extensions of <br />the Project or any other project; however, extensions of the Project by <br />Owner or others which do not affect the basis of Engineer's work shall <br />not terminate the obligation assumed by Engineer under this agreement. <br /> <br />3 <br /> <br />"./..,,.,-..... .~""'Mc.. <br />