Laserfiche WebLink
2.1 CITY agrees to furnish and deliver, and PGEN agrees to purchase and take, a <br />supply of water in accordance with the terrns and conditions hereof. Said supply of water shall <br />be delivered by CITY to and taken by PGEN via a 12 -inch potable water service line which <br />comes up to the southwest comer of the PGEN Power Plant and connects to a flinch ISCO <br />Magnetic Flow Tube, which includes a flow versus time recording device and a pressure versus <br />time recording device (the "Meter"). Should PGEN request that the Meter be replaced by a <br />substitute meter, such replacement meter and all costs for the installation of the same shall be <br />bome by PGEN. If the Meter, or any replacement meter, shall by CITY be deemed to need <br />replacement or repair, then the cost of such shall be bome equally by CITY and PGEN. In either <br />case, such meter replacement shall be accomplished without amendment to this Agreement by <br />giving notice of the manufacturer's name, model and meter number of the new meter, which <br />notice shall be delivered to the appropriate persons as provided for in Paragraph 10.8, and <br />which shall be affixed to this Agreement as an appendix. Any replacement meters, and the <br />location of such replacement meters, shall be selected by CITY and meet appropriate <br />"American Water Works Association" standards. <br />2.2 The potable water furnished shall be used exclusively for the operation of <br />PGEN'S electrical cogeneration Plant located at 301 Lake Crook Road, CITY, Lamar <br />County, Texas. <br />III. <br />Quantities to be Furnished <br />3.1 The average daily supply of water furnished shall meet all reasonable <br />requirements of PGEN, subject to such limitations and rates stated herein. The maximum <br />volume of water to be delivered to and taken by PGEN during each Rate Year shall not exceed <br />Five Hundred Million Gallons (500 MG) which consists of a firm water supply equal to Two <br />Hundred and Twenty Million Gallons (220 MG) (the "Contracted Firm Water"), and the Option <br />Water supply that PGEN has reserved and can elect to receive in whole or in part at any time <br />during a Rate Year. In no instance shall PGEN require delivery of water under this Agreement <br />in an amount exceeding One Million Five Hundred Thousand (1,500,000) gallons of water per <br />day, or One Thousand Six Hundred Twenty -Five (1625) gallons of water per minute. <br />3.2 PGEN will advise CITY a minimum of forty-eight (48) hours prior to the <br />implementation of any planned changes to PGEN'S operations that would materially affect <br />the amount of water expected to be used by PGEN for any extended period of time. For the <br />purpose of this Agreement, a material effect on water use means a change that would cause <br />or contribute to PGEN'S water consumption varying by Two Hundred Fifty Thousand <br />(250,000) gallons or more on a daily basis, excluding variances occasioned by operational <br />dispatch, forced (unplanned and immediate) outages, or unscheduled maintenance outages. <br />PGEN will notify CITY, as provided for in paragraph 10.8, by November 15th of each calendar <br />year concerning PGEN'S then current schedule of planned outages for the following year. <br />On the occurrence of a water consumption variance that materially and adversely impacts <br />the integrity of the CITY'S water system, CITY maintains the right to limit any increase in <br />water sold to PGEN and shall work with PGEN, in good faith, to meet PGEN'S water needs. <br />ki <br />