My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11 - Water Service Agreement with Paris Generation LP
City-of-Paris
>
City Council
>
Agenda Packets
>
2022
>
07 - JULY
>
July 11
>
11 - Water Service Agreement with Paris Generation LP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2022 2:42:00 PM
Creation date
7/7/2022 2:39:25 PM
Metadata
Fields
Template:
AGENDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PGEN'S expense maintain the 12 -inch service line and valves beginning at the valve <br />nearest the tap, and all pipe and valves between the tap and the Meter, excluding the <br />valves immediately at the meter. PGEN shall at PGEN'S expense maintain meter isolation <br />valves immediately at the Meter and the Meter emergency by-pass valves. PGEN shall <br />maintain at all times, in working order, a back-flow prevention device approved by CITY, <br />which device can be used for protecting CITY'S system from contamination in the event <br />of PGEN'S system becoming contaminated, or in the event the integrity of PGEN'S <br />system is violated. CITY shall provide PGEN with at least a 48-hour notice prior to any <br />scheduled repairs to the Plant's water supply distribution system. <br />7.2 CITY'S representative may regularly inspect the Meter and report when the <br />same is known or suspected.to be registering incorrectly. The Meter shall be repaired by <br />a service representative qualified to work on the Meter being repaired. In the event the <br />Meter must be replaced, CITY will determine a replacement meter and the method of <br />replacement. The cost of maintenance or repair will be apportioned in accordance with <br />Paragraph 5.1. <br />7.3 CITY'S representative assisted by a service representative qualified to work <br />on the Meter being repaired, will annually during each calendar year, test the accuracy <br />and performance of the Meter and will calibrate the Meter measuring PGEN'S <br />consumption, to verify its accuracy. CITY may, at its discretion, choose to calibrate the <br />Meter more frequently, if conditions so warrant. The cost of the calibration will be <br />apportioned in accordance with paragraph 5.1. A representative of PGEN will be notified <br />in advance of any testing and/or calibration of the Meter and shall have the right to witness <br />any such testing. All testing of the Meter will be performed by a qualified representative <br />or mutually agreed upon testing service. <br />7.4 When it is determined that the Meter measuring PGEN'S consumption has <br />registered incorrectly, an estimate of the amount of water furnished through the faulty <br />Meter shall be prepared by CITY'S Director of Finance for the purpose of billing PGEN. <br />The estimate shall be based upon such method (such as a water usage measurement <br />correlated to actual electrical generation) which would most accurately reflect the actual <br />consumption for the period in which the Meter failure occurred as mutually agreed upon <br />by the City Manager of CITY and Plant Manager of PGEN. <br />7.5 For the Meter to be determined as "registering incorrectly," the Meter must <br />be found to be in error by plus or minus two and a half percent (2.5%), or greater. If the <br />degree of error is plus or minus two and a half percent (2.5%), or greater, then the <br />estimated amount of water furnished to PGEN will be calculated as stated in paragraph <br />7.4. <br />VIII. <br />Rates <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.