My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
13 - Interlocal Agreement with North Lamar ISD related to a collector street
City-of-Paris
>
City Council
>
Agenda Packets
>
2022
>
07 - JULY
>
July 11
>
13 - Interlocal Agreement with North Lamar ISD related to a collector street
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2022 2:52:07 PM
Creation date
7/7/2022 2:51:48 PM
Metadata
Fields
Template:
AGENDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Re: Cost Associated with Collector Road <br />Mrs. Stewart <br />Harrison, Walker & Harper LLC has contracted with subcontractors that are involved in the scopes of work <br />that pertain to the collector road associated with the New Elementary 2-5 building designed by Parkhill <br />Architects. The defined items on the following page are the costs HWH understands that could be <br />reimbursed by the City of Paris. <br />Scope of Work at Collector Road: <br />The widening of driveway/ roadway to accommodate City of Paris requirements for collector road from <br />Highway 271 N. This involves extra clearing, soil stripping, cut and fill, lime stabilization, respread of <br />associated topsoil, storm and sewer pipe extensions and widening of concrete pavement per drawings <br />provided by Parkhill Architects dated 04.14.2022. <br />Total cost of widenin roadwa 162 079.71 <br />Other Items: <br />Landscape that was bid as an alternate involved the landscape (trees, plant beds, irrigation) buffering and <br />sidewalks along the side of the collector road and were defined by bid documents. <br />• Alt #4 - Landscape buffer at the public street of $ 89,795.00 <br />As requested, these are the scopes of work and values that have been identify with collector road and <br />buffer requirement as defined by Parkhill construction documents. If you have any questions, please let <br />us know. <br />AarBer}apn <br />Chief Estimattor <br />Harrison, Walker & Harper, LLC <br />Cc: <br />Cory Wood - HWH <br />Nicco Genzer - Parkhill <br />Hector De Santiago - Parkhill <br />Harrison, Walker & Harper, LLC 1 2510 S Church St I Paris, Texas 75460 1 800.442.TEAM IIII'"'uwl"'f S tour"'lu"'lli <br />
The URL can be used to link to this page
Your browser does not support the video tag.