Laserfiche WebLink
<br />1.7.1 Providing analyses of the Owner's needs, and pro- <br />gramming the requirements of the Project. <br /> <br />1.7.2 Providing financial feasibility or other special <br />studies. <br /> <br />1.7.3 Providing planning surveys, site evaluations, envi- <br />ronmental studies or comparative studies of prospective <br />sites, and preparing special surveys, studies and submis- <br />sions required for approvals of governmental authorities <br />or others having jurisdiction over the Project. <br /> <br />1.7.4 Providing services relative to future facilities, sys- <br />tems and equipment which are not intended to be con- <br />structed during the Construction Phase. <br /> <br />1.7.5 Providing services to investigate existing conditions <br />or facilities or to make measured drawings thereof, or to <br />verify the accuracy of drawings or other information fur- <br />nished by the Owner. <br /> <br />1.7.6 Preparing documents of alternate, separate or <br />sequential bids or providing extra services in connection <br />with bidding, negotiation or construction prior to the <br />completion of the Construction Documents Phase, when <br />requested by the Owner. <br /> <br />1.7.7 Provicjing coordination of Work performed by <br />separate contractors or by the Owner's own forces. <br /> <br />1.7.8 Providing services in connection with the work of <br />a construction manager or separate consultants retained <br />by the Owner. <br /> <br />1.7.9 Providing Detailed Estimates of Construction Cost, <br />analyses of owning and operating costs, or detailed quan- <br />tity surveys or inventories of material, equipment and <br />labor. <br /> <br />1.7.10 Praviding interior design and other similar ser- <br />vices required for or in connection with the selection, <br />procurement or installation of furniture, furnishings and <br />related equipment. <br /> <br />1.7.11 Providing services for planning tenant or rental <br />spaces. <br /> <br />1.7.12 Making revisions in Drawings, Specifications or <br />other documents when such revisions are inconsistent <br />with written approvals or instructions previously given, <br />are required by the enactment or revision of codes, laws <br />or regulations subsequent to the preparation of such doc- <br />uments or are due to other causes not solely within the <br />control of the Architect. <br /> <br />1.7.13 Preparing Drawings, Specifications and supporting <br />data and providing other services in connection with <br />Change Orders to the extent that the adjustment in the <br />Basic Compensation resulting from the adjusted Con- <br />struction Cost is not commensurate with the services re- <br />quired of the Architect, provIded such Change Orders are <br />required by causes not solely within the control of the <br />Architect. <br /> <br />1.7.14 Making investigations, surveys, valuations, inven- <br />tories or detailed appraisals of existing facilities, and serv- <br />ices required in connection with construction performed <br />by the Owner. <br /> <br />1.7.15 Providing consultation concerning replacement of <br />any Work damaged by rire or other cause during con- <br /> <br />struction, and furnishing services as may be required in <br />connection with the replacement of such Work. <br /> <br />1.7.16 Providing services made necessary by the default <br />of the Contractor, or by major defects or deficiencies in <br />the Work of the Contractor, or by failure of performance <br />of either the Owner or Contractor under the Contract for <br />Construction. <br /> <br />1.7.17 Preparing a set af reproducible record drawings <br />showing significant changes in the Work made during <br />construction based on marked-up prints, drawings and <br />other data furnished by the Contractor to the Architect. <br /> <br />1.7.18 Providing extensive assistance in the utilization of <br />any equipment or system such as initial start-up or testing, <br />adjusting and balancing, preparation of operation and <br />maintenance manuals, training personnel for operation <br />and maintenance, and consultation during operation. <br /> <br />1.7.19 Providing services after issuance to the Owner of <br />the final Certificate for Payment, or in the absence of a <br />final Certificate far Payment, more than sixty days after <br />the Date of Substantial Completion of the Work. <br /> <br />1.7.20 Preparing to serve or serving as an expert witness <br />in connection with any public hearing, arbitration pro- <br />ceeding or legal proceeding. <br /> <br />1.7.21 Providing services of consultants for other than <br />the normal architectural, structural, mechanical and elec- <br />trical engineering services for the Project. <br /> <br />1.7.22 Providing any other services not otherwise in- <br />cluded in this Agreement or not customarily furnished in <br />accordance with generally accepted architectural practice. <br /> <br />1.8 TIME <br /> <br />1.8.1 The Architect shall perform 8asic and Additional <br />Services as expeditiously as is consistent with professional <br />skill and care and the orderly progress of the Work. Upon <br />request of the Owner, the Architect shall submit for the <br />Owner's approval, a schedule for the performance of the <br />Architect's services which shall be adjusted as required as <br />the Project proceeds, and shall include allowances for peri- <br />ods of time required for the Owner's review and approval <br />of submissions and for approvals of authorities having <br />jurisdiction over the Project. This schedule, when approved <br />by the Owner, shall not, except for reasonable cause, be <br />exceeded by the Architect. <br /> <br />ARTICLE 2 <br /> <br />THE OWNER'S RESPONSIBILITIES <br /> <br />2.1 The Owner shall provide full information regarding <br />requirements for the Project including a program, which <br />shall set forth the Owner's design objectives, constraints <br />and criteria, including space requirements and relation~ <br />ships, flexibility and expandability, special equipment and <br />systems and site requirements. <br /> <br />2.2 If the Owner provides a budget for the Project it <br />shall include contingencies for bidding, changes in the <br />Work during construction, and other costs which are the <br />responsibility of the Owner, including those described in <br />this Article 2 and in Subparagraph 3.1.2. The Owner shall, <br />at the request of the Architect, provide a statement of <br />funds available for the Project, and their source. <br /> <br />AlA DOCUMENT .141 . OWN[R.ARCtmfn ....GREEM[NT . THIRTEENTH EDITION. JULY 1'" . ....1.... . C) 1977 <br />THE AMERICAN INSTITUTE OF AKCHHECTS, 11lS NE.W YORK AVENUE, N.W., WASHINGTON, D.C. 2(D)6 <br /> <br />'141-1977 5 <br />