My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
16 - Final Plat - B&B Wash Addition Lot 1 Block A - 324 N. Main Street - LCAD 30005
City-of-Paris
>
City Council
>
Agenda Packets
>
2022
>
07 - JULY
>
July 25
>
16 - Final Plat - B&B Wash Addition Lot 1 Block A - 324 N. Main Street - LCAD 30005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2022 7:59:44 AM
Creation date
7/21/2022 4:47:46 PM
Metadata
Fields
Template:
AGENDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item No. 16 <br />TO: Mayor, Mayor Pro -Tem and City Council <br />Grayson Path, City Manager <br />FROM: Andrew Mack, AICP Director Planning & Community Development <br />SUBJECT: Approve the Final Plat of the B & B Wash Addition, Lot 1, Block A, located at <br />324 N. Main Street (LCAD 30005). <br />MTG. DATE: July 25, 2022 <br />BACKGROUND <br />At its meeting held on July 5, 2022, the Planning & Zoning Commission approved the <br />preliminary plat and recommended approval of the final plat with conditions. <br />RECOMMENDATION <br />Staff recommends approval of the Final Plat of the B & B Wash Addition, Lot 1, Block A, <br />subject to the following recommended conditions of the City Engineer: <br />1. Chapter 9, Exhibit A, Section IV, (5): ROW should be shown on 1" St NE. <br />2. Chapter 9, Exhibit A, Section IV, (7): The sewer along Pine Bluff is not located <br />correctly. As builts will be sent to the surveyor. <br />3. Chapter 9, Exhibit A, Section IV, (7): A manhole should be shown on Pine Bluff and N <br />Main. <br />4. Chapter 9, Exhibit A, Section IV, (7): A manhole should be shown on Pine Bluff and 1St <br />St NE. <br />5. Chapter 9, Exhibit A, Section IV, (7): Storm water inlets along Pine Bluff should be <br />shown. <br />6. Chapter 9, Exhibit A, Section IV, (7): The water line on 1St St NE should be labeled. <br />7. Chapter 9, Exhibit A, Section IV, (7): The fire hydrant on N Main and Pine Bluff <br />should be shown. <br />8. Chapter 9, Exhibit A, Section VIII, A, E7, E14: Dedication of ROW will be required <br />along 1St St NE if there is not adequate ROW. <br />9. Chapter 9, Exhibit A, Section VIII, A, E7, E14: The final plat shall either be revised to <br />provide the required 10 ft. ROW dedication along the lot frontage on North Main Street <br />prior to release of final plat for recording purposes, and prior to issuance of a building <br />permit; or the applicant shall be required to first apply for and receive approval of a <br />variance for the 10 ft. dedication of ROW requirement along the lot frontage on North <br />Main Street prior to release of the final plat for recording and issuance of a building <br />permit. <br />
The URL can be used to link to this page
Your browser does not support the video tag.