My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
24 - Amendment to Agreement for Professional Services with Garver engineering - Wastewater Treatment Plant Project - Amendment No. 2
City-of-Paris
>
City Council
>
Agenda Packets
>
2022
>
08 - AUGUST
>
August 22
>
24 - Amendment to Agreement for Professional Services with Garver engineering - Wastewater Treatment Plant Project - Amendment No. 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2022 9:06:28 AM
Creation date
8/18/2022 8:50:17 AM
Metadata
Fields
Template:
AGENDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APPENDIX A — AMENDMENT 2 SCOPE OF SERVICES <br />General <br />Generally, the Scope of Services for Amendment 2 includes professional services necessary for <br />construction phase services for the recommended improvements to the City of Paris Wastewater <br />Treatment Plant (WWTP) as detailed in the design documents as prepared by Garver under Amendment <br />1. <br />The designs developed underAmendment 1 were developed with the intention of being constructed under <br />two construction contracts: Construction Package 1 and Construction Package 2. The scope of services <br />for Amendment 2 includes only the construction phase services for Construction Package 1. <br />The planned improvements in Construction Package 1 include the modification and refurbishment of <br />existing facilities as well as construction of new facilities atthe existing WWTP to meet the targeted <br />capacity and treatment criteria for baseline improvements to the existing WWTP and to prepare for <br />Construction Package 2. <br />The improvements in Construction Package 1 include the rehabilitation, modification, or construction <br />of the following: <br />• Influent splitter box <br />• Primary clarifiers <br />• Primary sludge pump station <br />• Aeration basins, aeration basin blowers, and electrical building <br />• Mixed liquor splitter box <br />• Final clarifiers <br />• RASNVAS pump station <br />• Sludge dewatering building and equipment <br />• Recycle flow pump station <br />• Non -potable water pump station <br />• Sludge holding tanks and blowers <br />The project includes an associated array of piping enhancements and civil/yard enhancements, <br />together with electrical, instrumentation, and control enhancements to develop a complete and <br />functional facility capable of treating 7.25 MGD permitted design flow. <br />1. Construction Phase Services for Construction Package 1 <br />1.1. Construction Administration <br />During the construction phase of work, Garver will accomplish the following: <br />• Issue a Notice to Proceed letter to the Contractor and attend preconstruction meeting. <br />• Prepare for and attend utilities coordination meeting. <br />• Attend progress/coordination meetings with the Owner/Contractor. <br />• Evaluate and respond to construction material submittals and shop drawings. Corrections or <br />comments made by Consultant on the shop drawings during this review will not relieve Contractor <br />from compliance with requirements of the drawings and specifications. The check will only be for <br />review of general conformance with the design concept of the project and general compliance with <br />the information given in the contract documents. The Contractor will be responsible for confirming <br />and correlating all quantities and dimensions, selecting fabrication processes and techniques of <br />construction, coordinating his work with that of all other trades, and performing his work in a safe <br />and satisfactory manner. Consultant's review shall not constitute approval of safety precautions <br />Appendix A - Scope of Services <br />Amendment 2 1 of 6 Version 3 <br />City of Paris WWTP Improvements <br />
The URL can be used to link to this page
Your browser does not support the video tag.