Laserfiche WebLink
retail or commercial development along Hwy 82. Staff recommends approval of the <br />rezoning to Commercial. <br />The public hearing was declared open. With no one else speaking the public hearing was <br />declared closed. <br />A motion was made by Austin Anthony, seconded by Francine Neeley to approve the <br />zoning change. Motion carried 6-0. <br />Consideration of and action on the Preliminary Plat of the Sugg Addition, Lots 1 and 2, <br />Block A. LCAD Property 71599, located at 2296 SE 3 d Street. <br />Andrew Mack states the applicant has submitted a preliminary plat in order to subdivide <br />4 0 <br />and develop a previously unplatted parcel. Engineering staff recommends approval with <br />noted conditions: <br />1. The title block notes 0.56 acres,- however, t" in the plat calls out 0. 548 acres. This <br />discrepancy should be addressed (Chapter 9, Exhibit A, Section <br />2. While a measurementfrom the centerline to the property line was provided, the actual <br />roadway centerline was not. Please provide roadway center line on the plat ((Chapter 9, <br />Exhibit A, Section IV, (5)). <br />3. Provide a referencefor the called 70'3rd Street ROW (Chapter 9, Exhibit A, Section IV, <br />(5)). <br />4. Please provide a vicinity map so this addition can be located (Chapter 9, Exhibit A, <br />Section <br />5. Please show additional frees that appear to be closer to theftont qf this property <br />(Chapter 9, Exhibit A, Section IV, (6)). <br />6 It appears that the line shownfor the 20'access and utility easement and 10'utility <br />easement are centerlines. Please make this clear on the plat (e.g. centerline 20'access <br />and utility easement) (Chapter 9, Exhibit A, Section <br />7. Provide appropriate bearings and distances so the 20 Y access and utty easement an/ <br />'1I / <br />oposed is misspelledfor each easement (Chapter 9, Exhibit A. Section IV, (6)). <br />9. The rear yard setbackfor 2F zoning is 10'. Update accordingly (Chapter 9, ExhibitA, <br />Section <br />10. Provide a bearing and distancefor the eastern boundary line (Chapter 9, Exhibit A, <br />Section <br />11. Provide the correct approval certificate on the plat (Chapter 9, Exhibit A. Section IV, <br />While not required on the preliminary plat and not covering all items required of the final plat, <br />tie fall owings items were noted during our review of the preliminary ,and" plat and should be <br />included on the final. plat: <br />L Easement to the west of Lot 2 ((Chapter 9, Exhibit A, Section V, (7)). <br />2. ownership informationfor the properties to the west ((Chapter 9, Exhibit A, Section V, <br />IP <br />(7)). <br />3. Label internal lot corners and bearings and distances of internal lot lines ((Chapter 9, <br />Exhibit A, Section V, (7)). <br />