Laserfiche WebLink
EXHIBIT - C <br />MATERIALS, LABOR, EQUIPMENT & MISCELLANEOUS <br />FOR INSTALLATION OF MANHOLES: <br />Lead time for acquisition and delivery of manholes is very minimal (3 -4 days); <br />therefore, we recommend that this be included in the contract awarded for the <br />repair and restoration work: <br />6 EA. <br />6' <br />- 8' <br />DEPTH <br />@ <br />$1,100. _ <br />$ 6,600. <br />5 EA. <br />8' <br />- 10' <br />DEPTH <br />@ <br />1,200. = <br />6,000. <br />2 EA. <br />10' <br />- 12' <br />DEPTH <br />@ <br />1,400. = <br />2,800. <br />4 EA. <br />12' <br />- 14' <br />DEPTH <br />@ <br />1,525. = <br />6,100. <br />3 EA. <br />16' <br />- 18' <br />DEPTH <br />@ <br />1,675. = <br />5,025. <br />2 EA. <br />18' <br />- 20' <br />DEPTH <br />@ <br />1,800. = <br />3,600. <br />1 EA. <br />20' <br />- 22' <br />DEPTH <br />@ <br />2,050. = <br />2,050. <br />1 EA. <br />22' <br />- 24' <br />DEPTH <br />@ <br />2,275. = <br />2,275. <br />1 EA. <br />24' <br />- 26' <br />DEPTH <br />@ <br />2,500. = <br />2,500. <br />SUB -TOTAL $36,950. <br />MATERIALS, LABOR, EQUIPMENT & MISCELLANEOUS <br />FOR STREET AND OTHER SPECIAL REPAIR AND RESTORATION: <br />2000 LF @ $20.00 = $40,000. <br />ENGINEERING, INSPECTION AND CONTINGENCIES: <br />Lump Sum Estimate <br />$60,000. <br />Based upon a preliminary review of available information - reasonable <br />alternatives include: <br />1. the use of polyethylene pipe at shallow depths and V.C.P. (clay) <br />elsewhere for a total project estimate of $ 585,000; <br />2. the use of polyethylene pipe at shallow depths and P.V.C. Perma -Loc <br />elsewhere for a total project estimate of $ 535,000; and, <br />3. the use of P.V.C. Perma -Loc pipe throughout for a total project <br />\ estimate of $ 495,000. <br />Thomas R. Pine, P.E. <br />City Engineer <br />