Laserfiche WebLink
Item No. 9 <br />Code Enforcement Re ort.,Au ust 2022 <br />Cases Worked: 232 <br />Cases Completed: 597 <br />Initial Inspections: 280 <br />Re -inspections: 287 <br />Total Inspections: 557 <br />Lots Abated: 230 <br />Other Work by Abatement Crew: <br />Tree & Brush Removal — 5 days <br />Removed Tires — 4 days <br />Removed Illegal Dumps — 2 days <br />Repaired/Serviced Equipment — 2 days <br />Mowed Loop 286 — 2 days. <br />Demolished Houses — 8 days <br />yildin and Standards_ qp rt: August, 2022 <br />9 properties were presented to the Building and Standards Commission: <br />805 Lamar 536 NW 3rd <br />1135 NW 7th 1125 E Center <br />464 NE 11th 1153 E Tudor <br />2320 W Kaufman 2405 W Austin <br />708 SE 6th <br />There were 2 structures demolished in August, 2022: <br />448 NE 8th <br />1021 NE 8th <br />