My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11 - Structural Engineering Agreemwnt to design the demolition of the Belford Building
City-of-Paris
>
City Council
>
Agenda Packets
>
2022
>
09 - SEPTEMBER
>
September 26
>
11 - Structural Engineering Agreemwnt to design the demolition of the Belford Building
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2022 1:24:06 PM
Creation date
9/22/2022 1:16:52 PM
Metadata
Fields
Template:
AGENDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
m Clientshall: <br />e Attend and participate in the pre-bidconference, bid opening, pre®c sr cin <br />conferences, construction progress and other ®relate eeings, and Site visits t <br />determine Substantial Completion and readiness of the completed or for final <br />payment. <br />2® Primarily communicate with gi eer's Subcontractors and Subconsultants through e <br />Engineer. <br />a, Promptly inform gi eer of the substance of any communications between Client <br />and Engineer's Subcontractors or Subconsultants. <br />b. Refrain from irecting the services of Engineer's Subcontractors or Subconsultants. <br />3m Authorize Engineer to provide Additional Services as set forth in Article 2 of ExhibitA o <br />e Agreement, as required® <br />4, Perform or provide the following: <br />a® Communications with any property claimholders. <br />b. Legal services related to dealings with ro erty claimholders. <br />2.05 Payment <br />Aa Client shall pay Engineer as set forth in Article 4 and Exhibit J. <br />B. Engineer's compensation is summarized as follows® if there is a conflict between the <br />following summary and the contents of Exhibit, then x i it J will prevail. <br />Description of Service Amount Basis <br />of <br />Compensation <br />vice (Article � � �....._. _ $46,960* Lump 1, 6asec Services Article 1 of Exhibit Exhibit A .... ...�. FI®url.... <br />�i it A Sura <br />22 mmA di ianal Serv�ees Article 2 W...w .., y <br />*Based on a2 -month continuous construction erio <br />1. Lump sum amount incorporate Engineer's labor, overhead, profit. <br />2® Lump sum amount excludesEngineer's Subcontractor aSu co sults s®car es® I <br />these services are required, they will be billed as Additional Services, Refer to Exhibit <br />3,01 Commencement <br />A. Engineer is authorized o begin rendering services as of the Effective Date. <br />3®02 Time for Completion <br />A. Engineer shall complete its obligations within a reasonable time. Specific periods of time for <br />rendering services, or specific dates by which services are to be completed, are provided in <br />Exhibit B, and are hereby agreed to be reasonable. <br />B. If, through no fault of Engineer, such periods of time or dates , are c, ,,,y; r or <br />, orderly <br />de <br />and continuous L * M d <br />"+i'O E-SOO, Agreement between Client and Engineer for Professional <br />a C National SocietV of Profession5d <br />r, a, . <br />and American Society of Civil Engineers. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.