Laserfiche WebLink
4. The undersigned will furnish the bonds required by the specifi- <br />cations and comply with all the laws of the State of Texas and the <br />municipal and county ordinances which are pertinent to construction <br />contracts of this nature, even though such laws or municipal <br />ordinances may not have been quoted or referred to in these <br />specifications. <br />5. The cash, certified check, or bid bond accompanying this <br />Y 9 proposal <br />shall be forfeited to Paris, Texas, to the extent of 10 percent of <br />the amount of the bid in case this proposal is accepted by the <br />owner, and the undersigned shall fail or refuse to execute the <br />contract and furnish the performance bond required by the <br />specifications, all within the time limit named therein and in <br />accordance with the provisions of this proposal and the plans and <br />specifications which are a part thereof. <br />6. The quantities stated in connection with the price schedule for the <br />contract submitted herewith are approximate only and payment shall <br />be made at the unit prices named for the actual quantities <br />incorporated in the completed work. <br />Only those items for which estimated quantities are given may be <br />increased or decreased at the unit prices named. If there shall be <br />an increase in the total payment for an item covered by a lump sum <br />price, it shall be computed on a basis of extra work for which an <br />increase in payment will have been earned, and if there be a <br />decrease in a lump sum payment for any such item, it shall be made <br />only as the result of negotiation between the undersigned and the <br />owner. <br />7. The owner reserves the right to require that any bidder, before <br />being awarded a contract, shall execute a noncollusion affidavit in <br />such form as will satisfy the owner that the bid offered is <br />genuine, is not a sham or collusive, and in no respect or degree is <br />made in the interest or on behalf of any person, firm, or <br />corporation not named in the proposal containing such bid. <br />8. In• order to establish a basis of quality certain processes, types <br />of machinery and equipment or kinds of materials may be specified <br />herein, by designating a manufacturer by name and referring to this <br />brand or product designation. It is not the intent of these <br />specifications to exclude other processes, equipment or materials <br />of a type and quality equal to those designated. <br />If a supplier desires to furnish items by manufacturers other than <br />those specified, he shall secure the written approval of the <br />engineer prior to submitting his order. <br />9. The Contractor is aware that the schedule of completion is a <br />material part of this contract. due to legal requirements which <br />exist for the owner. The Contractor shall complete the placement <br />of all cover material at the landfill by December 31, 1984, and <br />complete the entire project including all vegetative work by May 1, <br />1985, except that the deadline for completing the placement of <br />Proposal -,2 <br />