My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
15 - Award bid to Pridemore Construction for the southern boat ramp construction projection at Lake Crook
City-of-Paris
>
City Council
>
Agenda Packets
>
2022
>
10 - OCTOBER
>
October 24
>
15 - Award bid to Pridemore Construction for the southern boat ramp construction projection at Lake Crook
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2022 12:19:23 PM
Creation date
10/20/2022 11:56:17 AM
Metadata
Fields
Template:
AGENDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item No. 15 <br />ril <br />TO: Mayor <br />Mayor Pro Tem <br />City Council <br />FROM: Robert G. Vine, Assistant City Manager <br />SUBJECT: Lake Crook Boat Ramp Construction <br />DATE: October 24, 2022 <br />BACKGROUND: <br />In March of 2022, staff inspected the southern boat ramp at Lake Crook after receiving citizen <br />complaints about the condition of the structure. This inspection revealed large holes and several <br />large cracks in the concrete ramp where the structure was breaking apart. The holes and the broken <br />parts of the ramp made it difficult and unsafe for boaters to use the ramp to load and unload boats <br />without risking damage to boats or trailers and created a potential liable situation for the city. <br />The staff and Lamar County Chamber of Commerce have worked together with the Southern Drag <br />Boat Association and local boaters to design a replacement ramp that would be conducive for the <br />drag boats that race here every summer, as well as, for use by leisure boaters and those who use <br />Lake Crook for fishing. <br />STATUS OF ISSUE: <br />Staff constructed an earthen dam across the mouth of the cove to allow the existing boat ramp area <br />to dry in preparation for this project. While the dam is in place, staff is cleaning, deepening and <br />widening the cove. <br />Staff sought bids for this project in accordance with procurement policy and law. The scope of <br />work for this project includes the tear -out and replacement of the existing boat ramp and ramp <br />approach, parking lot improvements and removal of the earthen dam. The City received one sealed <br />bid from Pridemore Construction of $88,490.00. <br />
The URL can be used to link to this page
Your browser does not support the video tag.