My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
16 B - Award bid Phase I of the Wastewater Treatment Plant to Thalle Construction
City-of-Paris
>
City Council
>
Agenda Packets
>
2022
>
10 - OCTOBER
>
October 24
>
16 B - Award bid Phase I of the Wastewater Treatment Plant to Thalle Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2022 12:19:45 PM
Creation date
10/20/2022 12:03:17 PM
Metadata
Fields
Template:
AGENDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
October 11, 2022 <br />Grayson Path <br />City of Paris <br />135 SE 1 s' Street <br />Paris, TX 75460 <br />3010 Gaylord Parkway <br />Suite 190 <br />Frisco, TX 75034 <br />TEL 972.377.7480 <br />FAX 972.377.8380 <br />www.Ga rverUSA.com <br />Re: Paris Contract No. 1 Phase 1 WWTP Improvements <br />Recommendation of Award <br />Mr. Path: <br />Bids were received for the Contract 1 Phase 1 Wastewater Treatment Plant Improvements Project at <br />City Hall at 2:00 PM on September 801. A total of two (2) bids were received on the project. A tabulation <br />of the bids received is enclosed with this letter. The bids have been checked for accuracy and <br />compliance with the contract documents, and all bidders have provided the required documents. The <br />two base bids and associated bid alternates received are summarized as follows: <br />Thalle <br />Gracon <br />Item Type <br />Description <br />i Construction <br />Construction, <br />Co., Inc. <br />Inc. <br />Bid Item 1 <br />wwwwwwwwwwwww_ <br />All work except as indicated in other bid <br />$64,460,000 <br />$69,950,000 <br />items <br />Bid Item 2 <br />Trench Safety System <br />$5,000 <br />$2000 <br />Bid Item 3 <br />Cash Allowance 1: Double Disc Pump <br />$223,950 <br />$223,950 <br />Equipment <br />Bid Item 4 <br />Contingency Allowance 1 forwork <br />$1,000,000 <br />$1,000,000 <br />change directives <br />Contingency Allowance 2 for primary <br />Bid Item 5 <br />electrical service installation and <br />L $120,000 <br />$120,000 <br />rerouting <br />Bid Item 6 <br />Contingency Allowance 3 for Special <br />$60,000 <br />$60,000 <br />Inspections and independent testing <br />Bid Item 7 <br />Contingency Allowance 4 for additional <br />$45,000 <br />$45,000 <br />GPS -based survey <br />Bid Item 8 <br />Contin Allowance 5 for Additional <br />gencField <br />$20,000 <br />� <br />$20,000 <br />Trailer Equipment <br />Bid Item 9 <br />Additional area of 10" compacted gravel <br />- 0 <br />$50,000 <br />$65,000 <br />surface <br />Bid Item 10 <br />Solids, sludge, and grit removal and <br />$160,000 <br />$340,000 <br />disposal <br />Total Base Bid _ _ <br />$66,142,950 <br />71,843,950 <br />
The URL can be used to link to this page
Your browser does not support the video tag.