My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
17 - Change Order No. 1 for the bid with Thalle Construction - decrease by $2,266,308.00
City-of-Paris
>
City Council
>
Agenda Packets
>
2022
>
10 - OCTOBER
>
October 24
>
17 - Change Order No. 1 for the bid with Thalle Construction - decrease by $2,266,308.00
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2022 12:20:28 PM
Creation date
10/20/2022 12:03:52 PM
Metadata
Fields
Template:
AGENDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'ammmnd MUUMUU UO <br />•ONIa0re'NOIlOnHISN00 HOA 035n <br />d 36 O1 ION SILK 3Nnf NO GOMM <br />"3'd'ANS3fd 1131A1'dO ALNOHLIY 3H1 <br />tl30Nn M3IA3NYaN31NId03SOdHnd <br />S� 3H1 HOi 03SY313U SI 1N3Wn00061H1 <br />s NouonUISNOO <br />a0:Ii0N-M3UGH%0M <br />A& <br />L 'ON IOYHINOO <br />S1NMMOHMI d1MM L 3SVHd <br />8 <br />a <br />b <br />`*I" <br />�iie <br />OSVSL 6tl%31'Sltltld <br />O OO <br />oil <br />m <br />P <br />133N1S 1613 <br />SIMtld 4O A 5%1 l I:1 <br />F y <br />� <br />� <br />z� <br />LL� <br />8 � w <br />O591 <br />w <br />a <br />b <br />`*I" <br />�iie <br />oil <br />m <br />m w <br />z� <br />LL� <br />z <br />" <br />4� <br />I <br />° f <br />" <br />U <br />I <br />b <br />2.6 <br />2.6 <br />mW <br />�LL <br />n <br />I <br />ID W <br />cic 0, <br />c 11 <br />Uu y� <br />UA <br />c°r <br />mw <br />�M� <br />S <br />�® <br />O� <br />0 <br />�Wa s <br />o <br />0 <br />z, <br />YY11 i <br />n <br />dltl9/f „ <br />71 J <br />d1d 4>, <br />J , .... <br />-. <br />dlY A <br />wxae-aw <br />
The URL can be used to link to this page
Your browser does not support the video tag.