Laserfiche WebLink
ENGINEERING OUTLINE <br />EXHIBIT A <br />Preliminary Phase <br />1. Perform on -site survey to obtain data and details for preparation of <br />specifications. <br />2. Write specifications for purchase and installation of isolation flanges. <br />3. Compute requirements <br />4. Write specifications <br />system. <br />5. Write specifications <br />6. Design secondary flo <br />7. .Write specifications <br />for cathodic protection system. <br />for materials and installation of cathodic protection <br />for grout displacement under tank and between floors. <br />Dr and prepare engineering drawings. <br />for materials and installation of secondary floor. <br />8. Prepare list of potential bidders for all phases of.project. <br />9. Prepare requests for quotations and send to bidders, using procedures which <br />conform to City of Paris requlations. <br />10. Evaluate bids and recommend successful bidders to City. <br />Construction Phase <br />1. Conduct pre- construction meeting with contractor representatives to assure <br />specification understanding and schedule requirements. <br />2. Provide on -site inspector /coordinator for the duration of the project. <br />3. Conduct final inspection. <br />Post Construction Phase <br />I. Conduct an inspection 15 days after completion of the project to insure <br />tank isolation and proper electrical potential readings. <br />2. Prepare a final report of the entire project for City of Paris records. <br />6 <br />