My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1984-061 - McCrory Engineering, Inc. proposal for engineering and management services for repair
City-of-Paris
>
City Clerk
>
Resolutions
>
1889-2010
>
1930-1999
>
1980-1989
>
1984
>
1984-061 - McCrory Engineering, Inc. proposal for engineering and management services for repair
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2017 10:40:19 AM
Creation date
6/3/2005 10:13:00 AM
Metadata
Fields
Template:
CITY CLERK
Doc Name
1984
Doc Type
Resolution
CITY CLERK - Date
8/13/1984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENGINEERING OUTLINE <br />EXHIBIT A <br />Preliminary Phase <br />1. Perform on -site survey to obtain data and details for preparation of <br />specifications. <br />2. Write specifications for purchase and installation of isolation flanges. <br />3. Compute requirements <br />4. Write specifications <br />system. <br />5. Write specifications <br />6. Design secondary flo <br />7. .Write specifications <br />for cathodic protection system. <br />for materials and installation of cathodic protection <br />for grout displacement under tank and between floors. <br />Dr and prepare engineering drawings. <br />for materials and installation of secondary floor. <br />8. Prepare list of potential bidders for all phases of.project. <br />9. Prepare requests for quotations and send to bidders, using procedures which <br />conform to City of Paris requlations. <br />10. Evaluate bids and recommend successful bidders to City. <br />Construction Phase <br />1. Conduct pre- construction meeting with contractor representatives to assure <br />specification understanding and schedule requirements. <br />2. Provide on -site inspector /coordinator for the duration of the project. <br />3. Conduct final inspection. <br />Post Construction Phase <br />I. Conduct an inspection 15 days after completion of the project to insure <br />tank isolation and proper electrical potential readings. <br />2. Prepare a final report of the entire project for City of Paris records. <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.