My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
13 - Phase 1 Construction of Wastewater Treatment Plan Project Agreement with Thalle
City-of-Paris
>
City Council
>
Agenda Packets
>
2022
>
11 - NOVEMBER
>
November 14
>
13 - Phase 1 Construction of Wastewater Treatment Plan Project Agreement with Thalle
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2022 2:23:08 PM
Creation date
11/10/2022 2:04:48 PM
Metadata
Fields
Template:
AGENDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AGREEMENT <br />BETWEEN OWNER AND CONTRACTOR <br />FOR CONSTRUCTION CONTRACT (STIPULATED PRICE) <br />THIS AGREEMENT is by and between City of Paris „pmm mm� _.._...._. ("Owner") and <br />Thalle Construction Co., Inc. ("Contractor"). <br />Owner and Contractor hereby agree as follows: <br />ARTICLE 1 —WORK <br />1.01 Contractor shall complete all Work as specified or indicated in the Contract Documents. The <br />Work is generally described as follows: <br />ARTICLE 2 — THE PROJECT <br />2.01 The Project, of which the Work under the Contract Documents is a part, is generally described as <br />follows: <br />A. Paris WWTP Improvements Contract No. 1 - In general, the complete Work will provide <br />the Owner with upgrades to the existing Paris Wastewater Treatment Plant. More <br />specifically, the project includes, but is not limited to the following: <br />1. Construction on the existing WWTP site includes a new primary influent flow splitting <br />structure, two new primary clarifiers and a primary sludge pump station, new aeration <br />basins including a new blower facility, new mixed liquor splitter structure, new final <br />clarifier, new RASMAS sludge pumping station, a new electrical building with electrical <br />distribution and standby power generator, a solids dewatering facility with an adjoining <br />solids offloading and processing area, an additional electrical building near the <br />dewatering facility, a plant non -potable water pumping facility, and a recycle flow pump <br />station. <br />WWTP rehabilitation items Include rehabilitation of three final clarifiers, scum pump <br />station, and two solids holding tanks and connected sludge pumping station. <br />The project includes demolition, new auxiliary support facilities, and facility <br />enhancements throughout the facilities. The project includes an associated array of <br />piping enhancements and civil/yard enhancements, together with electrical, <br />instrumentation, and control enhancements to develop a complete and functional <br />facility. <br />ARTICLE 3 — ENGINEER <br />3.01 The Project has been designed by Garver, LLC. <br />3.02 The Owner has retained Garver, LLC ("Engineer") to act as Owner's representative, and to have <br />the rights, responsibilities, duties, and authority assigned to Engineer in the Contract Documents <br />in connection with the completion of the Work in accordance with the Contract Documents. <br />ARTICLE 4 — CONTRACT TIMES <br />4.01 Time of the Essence <br />A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness <br />for final payment as stated in the Contract Documents are of the essence of the Contract. <br />4.02 Contract Times: Days <br />Project No. 19W05100 1 Section 00 52 00 <br />Paris WWTP Improvements - Contract No. 1 Agreement <br />
The URL can be used to link to this page
Your browser does not support the video tag.