ARTICLE 6 — PAYMENT PROCEDURES <br />6.01 Submittal and Processing of Payments <br />A. Contractor shall submit Applications for Payment in accordance with Article 15 of the <br />General Conditions. Applications for Payment will be processed by Engineer as provided in <br />the General Conditions. <br />6.02 Progress Payments; Retainage <br />A. Owner may elect to make progress payments on account of the Contract Price on the basis <br />of Contractor's Applications for Payment on or about the 15th day of each month during <br />performance of the Work as provided in Paragraph 6.02.A.1 below, provided that such <br />Applications for Payment have been submitted in a timely manner and otherwise meet the <br />requirements of the Contract. All such payments are monies advanced for the purpose of <br />assisting the Contractor to expedite the work of construction. The Owner holds the right to <br />withhold any payment in accordance with Paragraph 15.01 of the General Conditions. All <br />such payments will be measured by the Schedule of Values established as provided in the <br />General Conditions (and in the case of Unit Price Work based on the number of units <br />completed) or, in the event there is no Schedule of Values, as provided elsewhere in the <br />Contract. <br />Prior to Substantial Completion, progress payments will be made in an amount equal to <br />the percentage indicated below but, in each case, less the aggregate of payments <br />previously made and less such amounts as Owner may withhold, including but not <br />limited to liquidated damages, in accordance with the Contract <br />a. 95 percent of Work completed (with the balance being retainage); and <br />b. 95 percent of cost of materials and equipment not incorporated in the Work (with <br />the balance being retainage). <br />B. Upon Substantial Completion, Owner shall pay an amount sufficient to increase total <br />payments to Contractor to 95 percent of the Work completed, less such amounts set off by <br />Owner pursuant to Paragraph 15.01.E of the General Conditions, and less 125 percent of <br />Engineer's estimate of the value of Work to be completed or corrected as shown on the <br />punch list of items to be completed or corrected prior to final payment. <br />6.03 Final Payment <br />A. Upon final completion and acceptance of the Work in accordance with Paragraph 15.06 of <br />the General Conditions, Owner shall pay the remainder of the Contract Price as <br />recommended by Engineer as provided in said Paragraph 15.06, minus any damages as <br />described in Paragraphs 4.03 and 4.04. <br />ARTICLE 7 — INTEREST <br />7.01 Not applicable. <br />ARTICLE 8 — CONTRACTOR'S REPRESENTATIONS <br />8.01 In order to induce Owner to enter into this Contract, Contractor makes the following <br />representations: <br />A. Contractor has examined and carefully studied the Contract Documents, and any data and <br />reference items identified in the Contract Documents. <br />B. Contractor has visited the Site, conducted a thorough, alert visual examination of the Site <br />and adjacent areas, and become familiar with and is satisfied as to the general, local, and <br />Site conditions that may affect cost, progress, and performance of the Work. <br />C. Contractor is familiar with and is satisfied as to all Laws and Regulations that may affect <br />cost, progress, and performance of the Work. <br />Project No, 19WO5100 3 Section 00 52 00 <br />Paris WINfP Improvements - Contract No. 1 Agreement <br />