Laserfiche WebLink
<br />,..,-~ <br /> <br />2. CONSTRUCTION PHASE <br /> Direct Salary Cost <br /> PM 2 @ 192 z 384 <br /> PE 8 @ 160 1,280 <br /> CE 4 @ 132 528 <br /> EE 4 @ 140 = 560 <br /> O.S. 3 @ 52 156 <br /> - <br /> Subtotal Direct Salary 2,908 <br /> Expenses <br /> Progress Meetings (10) <br /> Round trip auto 10 x 200 mi @ .25 500 <br /> Per diem 10 x 10.00 = 100 <br /> Telephone 2 calls/month xlOx5 = 100 <br /> Reproduction = 50 <br /> Subtotal Expenses $750 <br />3. PROJECT TOTAL <br /> FEE <br /> SALARY = 2.75(10720 + 2908) = 37,477 <br /> EXPENSES = (760 + 790) = 1,510 <br /> JC./f- 38,987 <br /> <br />Say $38,900 <br />